Related Experiment Video
Updated: Jun 15, 2026

Measurement of the Potential Rates of Dissimilatory Nitrate Reduction to Ammonium Based on 14NH4+/15NH4+ Analyses via Sequential Conversion to N2O
Published on: October 7, 2020
Nitrogen removal during summer and winter in a primary facultative waste stabilization pond: preliminary findings
E R C van der Linde1, D D Mara
1School of Civil Engineering, Woodhouse Lane, University of Leeds, Leeds LS2 9JT, UK. e.r.c.vanderlinde00@leeds.ac.uk
Abstract:
Nitrogen removal mechanisms and pathways within WSP have been the focus of much research over the last 30 years. Debates and theories postulated continue to refine our knowledge regarding the cycling and removal pathways for this important nutrient, but a succinct answer has yet to be provided for holistic nitrogen removal. In this study, two experimental runs using labelled (15)N as a stable isotope tracking technique were conducted on a pilot-scale primary facultative WSP in the UK; one in the summer of 2006, and the other in the winter of 2007. An ammonium chloride ((15)NH(4)Cl) spike was prepared as the slug for each experimental run, which also contained rhodamine WT to act as a dye tracer enabling the hydraulic characteristics of the pond to be mapped. Initial results from the study are reported here, and findings are compared and contrasted. Preliminary findings reveal that a greater proportion of (15)N is incorporated into the algal biomass by assimilation and subsequent release as soluble organic nitrogen in summer than in winter. (15)N ammonium passes out of the system much sooner and in a much higher proportion in the winter than in summer.
Related Concept Videos
Microbial Wastewater Treatment
Comparative Excretory Systems
Microbes and the Nitrogen Cycle
Overview of Nitrogen Metabolism
The largest pool of nitrogen available in the terrestrial ecosystem is gaseous nitrogen (N2) from the air, but this nitrogen...
The Nitrogen Cycle
Biological Treatment of Effluent and Waste Water

