Related Experiment Video
Updated: Jun 15, 2026

Preparing an Isotopically Pure 229Th Ion Beam for Studies of 229mTh
Published on: May 3, 2019
Status report of the heavy ions source research and development for Spiral2
T Thuillier1, T Lamy, C Peaucelle
1Laboratoire de Physique Subatomique et de Cosmologie, UJF-CNRS/IN2P3-INPG, 53 rue des Martyrs, Grenoble Cedex 38026, France. thuillier@lpsc.in2p3.fr
Abstract:
The physics background requiring a very intense multicharged heavy ion source for Spiral2 is explained. The new Spiral2 low energy beam line dedicated to the heavy ions production and equipped with PHOENIX V2 ECRIS is presented. A status of the A-PHOENIX commissioning at 18 GHz is summarized. A new hybrid ECRIS concept with a cryogenic permanent magnet hexapole is proposed as an improvement of A-PHOENIX technology.
More Related Videos
07:31Characterization of Recombination Effects in a Liquid Ionization Chamber Used for the Dosimetry of a Radiosurgical Accelerator
Published on: May 9, 2014
12:05U2O5 Film Preparation via UO2 Deposition by Direct Current Sputtering and Successive Oxidation and Reduction with Atomic Oxygen and Atomic Hydrogen
Published on: February 21, 2019