Related Experiment Video
Updated: Jun 15, 2026

11:34
High-resolution, High-speed, Three-dimensional Video Imaging with Digital Fringe Projection Techniques
Published on: December 3, 2013
Abstract:
A method of profile control or measurement using projected fringes is presented. The fringes are dynamically translated over the object, and the phase of the signal picked up at a selected point on the surface is used to determine the depth or the depth error of the profile at this point. The method has the advantage of being contact-free, fast, accurate, and easily automated.
Related Concept Videos
Fischer Projections
Learning to draw Fischer projections of molecules and understanding their relevance plays a crucial role in the visual depiction of organic molecules. A Fischer projection is a two-dimensional projection on a planar surface to simplify the three-dimensional wedge–dash representation of molecules. This is especially helpful in the case of molecules with multiple chiral centers that can be difficult to draw. Here, all the bonds of interest are represented as horizontal or vertical lines. While...
Distance Measurements by Taping
Tapes are essential in surveying for accurate, durable, and short-distance measurements. Made from lightweight, nylon-coated steel, they offer flexibility and strength for rugged outdoor use. The nylon coating protects against rust and wear, extending the tape's life. Standard lengths, around 30 meters, are marked in meters and millimeters for precision.Surveyors select tapes based on site conditions and accuracy needs. Lightweight, nylon-coated tapes are commonly used for ease of handling and...
Profile Leveling and Cross Sections
Profile leveling and cross-sections are surveying methods used to determine and document terrain elevations for infrastructure projects such as highways, railroads, canals, and pipelines. These methods provide data for earthwork planning and alignment of proposed routes. Profile leveling involves measuring elevations along a fixed line to create a vertical terrain profile. A surveyor sets up a leveling instrument at the benchmark (BM) and records a backsight (BS) to determine the instrument's...

