Influence of prolonged setting time on permanent deformation of elastomeric impression materials

Markus Balkenhol1, Sylvia Haunschild, Christina Erbe

  • 1Department of Prosthodontics, Justus Liebig University, Giessen, Germany. markus.balkenhol@dentist.med.uni-giessen.de <markus.balkenhol@dentist.med.uni-giessen.de>

Abstract

Related Concept Videos

Setting Time of Cement01:12

Setting Time of Cement

The setting time of cement refers to the process of cement paste transitioning from a plastic state to a solid state. This process is crucial in construction as it dictates the timeframe for concrete placement, compaction, and finishing. The onset of this solidification is termed the initial set, indicating when the paste becomes unworkable. The final set is when the paste has solidified completely, and further handling or manipulation can no longer affect its shape. The cement strength is...
Plastic Behavior01:21

Plastic Behavior

A material's elastic behavior is characterized by the disappearance of stress once the load is removed, allowing the material to return to its original state. However, when stress surpasses the yield point, yielding commences, marking the onset of plastic deformation or permanent set. This change from elastic to plastic behavior is influenced by the peak stress value and the duration before the load is removed. An intriguing observation occurs when a specimen is loaded, unloaded, and reloaded.
Residual Stresses in Bending01:18

Residual Stresses in Bending

In the study of elastoplastic members subjected to bending moments, understanding the loading and unloading phases is crucial for assessing material behavior and structural integrity. During the loading phase, as the bending moment increases, the material initially responds elastically, adhering to Hooke's Law, where stress is directly proportional to strain. When the load exceeds the yield strength, plastic deformation occurs, resulting in permanent strain and deformation that remains even...
Retarders01:19

Retarders

Retarders are chemical admixtures designed to extend the setting time, which is especially useful when there is a delay in sequential concrete pours to prevent cold joints and to achieve a cohesive structure. Retarders, when used in appropriate amounts, can also enhance the architectural appearance of exposed aggregate finishes.
The function of retarders is to delay the setting of concrete, and this effect can be measured using a penetration test. The retardation process involves adding...
Creep in Concrete01:22

Creep in Concrete

Creep refers to the time-dependent increase in strain under a sustained load, excluding other time-dependent deformations associated with shrinkage, swelling, and thermal expansion in concrete. The primary mechanism behind creep involves the loss of physically adsorbed water from the calcium silicate hydrate within the hydrated cement paste. This process is further exacerbated by concrete's non-linear stress-strain relationship, microcrack development in the interfacial transition zone, and...
Testing Water Quality01:14

Testing Water Quality

When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...