Overhead drilling: comparing three bases for aligning a drilling jig to vertical

David Rempel1, Demetra Star, Alan Barr

  • 1Ergonomics Program, University of California, San Francisco, 1301 S. 46th Street, Richmond, CA 94804, USA. david.rempel@ucsf.edu

Summary

New overhead drilling interventions reduced worker fatigue and improved usability compared to the usual method. The "Collar Base" design showed the most promise for preventing workplace injuries in construction.

Related Concept Videos

Taping Over Different Ground Profiles01:12

Taping Over Different Ground Profiles

Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
Upward Impending Motion01:21

Upward Impending Motion

A square-threaded screw jack is a mechanical device widely used for lifting heavy loads or applying considerable force. Its operation is based on converting the force applied at its handle into a torsional moment, causing the upward impending motion of the screw. This movement is accomplished by overcoming the static friction between the threads of the screw and the jack.
To better comprehend how a screw jack functions, consider the completely unraveled thread as a block in contact with the...
Common Leveling Mistakes and Errors01:17

Common Leveling Mistakes and Errors

A survey team is tasked with determining the elevation difference between points Point A and Point B, separated by uneven terrain. They use a leveling instrument and a leveling rod.Common MistakesMisreading the Rod: During a backsight reading at Point A, the instrumentman observes the rod partially obscured by tall grass. Instead of reading 1.135 m, they mistakenly record 1.735 m due to the misalignment of the crosshair with the wrong graduation. This error adds 0.600 m to all subsequent...
Adjusting a Traverse01:12

Adjusting a Traverse

In the site survey of a four-sided traverse, internal angles are essential to ensure geometric accuracy. The survey revealed that the sum of the measured internal angles was 359 degrees and 48 minutes, which is 12 minutes less than the expected 360 degrees. This discrepancy signals an error likely arising from measurement inaccuracies during the fieldwork.To rectify this error, the adjustment process involved distributing the 12-minute shortfall equally across the four internal angles. By...
Differential Leveling01:12

Differential Leveling

Differential leveling is a precise method in surveying used to determine the elevation difference between two points. Its primary goal is to establish accurate vertical measurements to create level surfaces or grade lines critical for designing and constructing infrastructures such as roads, bridges, and buildings.The procedure for differential leveling begins with setting up and leveling the instrument at a point where the benchmark can be seen. The level rod is held on the benchmark (BM), and...
Impact Loading on a Cantilever Beam01:13

Impact Loading on a Cantilever Beam

The analysis of a cantilever beam with a circular cross-section subjected to impact loading at its free end illustrates the conversion of potential energy from a dropped object into kinetic energy, which is then absorbed by the beam as strain energy. This process is crucial for understanding how materials behave under dynamic loads, which is important in fields such as construction and aerospace.
When an object is dropped onto the free end of a cantilever, its potential energy due to gravity is...