Damage costs produced by electric power plants: an externality valuation in the Mexico City Metropolitan Area
1Centro de Investigación en Energía, Universidad Nacional Autónoma de México, Privada Xochicalco S/N, Colonia Centro, Temixco, Morelos 62580, Mexico.
Abstract:
This paper presents an estimate of the externalities produced in the Mexico City Metropolitan Area (MCMA) through the impacts on health caused by secondary pollutants attributed to seven electric power plants located outside this area. An original method was developed to make possible a simplified application of the impact pathway approach to estimate the damage costs in the specified area. Our estimate shows that the annual costs attributed to secondary pollutants total 71 million USD (min/max 20/258 million USD). Finally, this paper discusses basic ideas on the implications for energy policy arising from this exercise in externality valuation.
Related Concept Videos
Calculations of Electric Potential II
Consider a...
Calculations of Electric Potential I
The ring is divided into infinitesimal small arcs such that point M is equidistant from all the arcs. Here, the cylindrical coordinate system is used to calculate the electric potential at point M. A general element of the arc between angles θ and θ + dθ is of the length Rdθ and has a charge of λRdθ.
Energy Losses in Transformers
There are four main reasons for energy losses in transformers.
The first cause can be the high resistance of the copper windings...
Calculation of Electric Flux
Electric Potential Energy
The electrostatic or Coulomb...
Electrical Power