Related Experiment Video
Updated: Jun 6, 2026

Mesocosm-Scale Constructed Wetland Design for Wastewater Treatment
Published on: May 2, 2025
Two strategies for improving animal farm wastewater treatment in reed beds
1Centre for Water Resources Research, School of Architecture, Landscape and Civil Engineering, Newstead Building, University College Dublin, Belfield, Dublin 4, Ireland. akintunde.babatunde@ucd.ie
Abstract:
In this study, dewatered alum sludge cakes were used as substrate in a laboratory scale tidal vertical flow reed bed system treating animal farm wastewater. Tidal flow operation was employed to enhance oxygen transfer into the system while dewatered alum sludge cake was used to enhance phosphorus (P) removal through ligand exchange. Except for the removal of P which was consistently high throughout the experiment, the removal of organics (BOD5, COD) exhibited a trend of gradual and increasing removal and this highlights the benefits of using dewatered alum sludge cake in the reed bed. For the removal of organics, a mean removal percentage of 82.3 +/- 3.5% was obtained for BOD5 at a mean loading rate of 84.6 g/m2.d. The first-order kinetics constant for BOD5 removal (K(BOD), m/d) obtained was about 9 times the rate constant commonly obtained in conventional horizontal flow systems. The mean level of dissolved aluminium (Al) monitored in the effluent was 0.04 +/- 0.01 mg/1 and this is well below the discharge limit of 0.2 mg/l for Al discharge into all waters.
Related Concept Videos
Biological Treatment of Effluent and Waste Water
Microbial Wastewater Treatment
Bioremediation
Bioreactor Controls-II
Comparative Excretory Systems
Bioreactor Design and Operational System

