Related Experiment Video
Updated: Jun 6, 2026

A Bending Test for Determining the Atterberg Plastic Limit in Soils
Published on: June 28, 2016
A shovel with a perforated blade reduces energy expenditure required for digging wet clay
Sridhar Harivanam1, Richard W Marklin, Paula E Papanek
1Marquette University, Milwaukee, WI 53210-1881, USA.
Objective:
A shovel with a blade perforated with small holes was tested to see whether a worker would use less whole-body energy to dig wet clay than with a shovel with an opaque blade.
Background:
A perforated shovel is hypothesized to require less whole-body energy on the basis of adhesion theory; a smaller surface area would require less physical effort to dig and release soil from the blade.
Method:
The study involved 13 workers from an electric utility who dug wet clay with two 1.5-m long-handled point shovels, which differed only in blade design (perforated and opaque). Oxygen consumption was measured with a portable system while each worker dug wet clay at a self-regulated pace for 10 min.
Results:
There was no significant difference in number of scoops dug during the 10-min sessions, but workers dug 9.5% more weight of clay with the perforated shovel than with the conventional shovel (404 kg vs. 369 kg, respectively). Furthermore, stable oxygen uptake normalized to weight of participant and to the weight of clay dug revealed that participants expended 11.7% less relative energy per kilogram of clay dug with the perforated shovel.
Conclusion:
A point shovel with a perforated blade is recommended for digging and shoveling wet clay. However, the extra weight that workers chose to dig with the perforated shovel may increase the loading on the spine and may offset the metabolic advantages.
Application:
Manual shoveling is a common task, and workers may experience less whole-body and muscle fatigue when using a perforated shovel.
Related Concept Videos
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the block.
Brick Cutting Techniques
Cut bricks are categorized by size. Bricks cut to half their original length are called half-bats, while those cut to three-fourths their length are known as three-fourth bats.
Special types of cut...
Wedges
Consider using a wedge to lift a heavy slab. Here, the wedge functions by converting the applied force into a much larger force directed almost perpendicular to the initial force. This...
Adaptations that Reduce Water Loss
Masonry in Cold and Hot Weather Conditions
Other key practices include keeping masonry units and sand dry and...
Design Example: Managing Concrete Workability
To address...

