Related Experiment Video
Updated: Jun 4, 2026

Scalable Step-by-Step Approach of Sustainable Bioplastic Production from Food Waste
Published on: July 18, 2025
A model for the implementation of a two-shift municipal solid waste and recyclable material collection plan that
Hung-Yueh Lin1, Zong-Pei Tsai, Guan-Hwa Chen
1Department of Environmental Engineering and Management, Chaoyang University of Technology, Taichung, Taiwan, Republic of China. hylin@cyut.edu.tw
Abstract:
Separating recyclables from municipal solid waste (MSW) before collection reduces not only the quantity of MSW that needs to be treated but also the depletion of resources. However, the participation of residents is essential for a successful recycling program, and the level of participation usually depends on the degree of convenience associated with accessing recycling collection points. The residential accessing convenience (RAC) of a collection plan is determined by the proximity of its collection points to all residents and its temporal flexibility in response to resident requirements. The degree of proximity to all residents is determined by using a coverage radius that represents the maximum distance residents need to travel to access a recycling point. The temporal flexibility is assessed by the availability of proximal recycling points at times suitable to the lifestyles of all residents concerned. In Taiwan, the MSW collection is implemented at fixed locations and at fixed times. Residents must deposit their garbage directly into the collection vehicle. To facilitate the assignment of collection vehicles and to encourage residents to thoroughly separate their recyclables, in Taiwan MSW and recyclable materials are usually collected at the same time by different vehicles. A heuristic procedure including an integer programming (IP) model and ant colony optimization (ACO) is explored in this study to determine an efficient two-shift collection plan that takes into account RAC factors. The IP model has been developed to determine convenient collection points in each shift on the basis of proximity, and then the ACO algorithm is applied to determine the most effective routing plan of each shift. With the use of a case study involving a city in Taiwan, this study has demonstrated that collection plans generated using the above procedure are superior to current collection plans on the basis of proximity and total collection distance.
More Related Videos
07:13Swabbing the Urban Environment - A Pipeline for Sampling and Detection of SARS-CoV-2 From Environmental Reservoirs
Published on: April 9, 2021
06:11Measuring Biomethane Potential of Food Scrap Waste Anaerobically Co-Digested with Waste-Activated Sludge Using Respirometry
Published on: April 26, 2024
Related Concept Videos
Biological Treatment of Effluent and Waste Water
Microbial Wastewater Treatment
Design Example: Sustainability in Concrete Building
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground cistern.
Sampling Plans
Random sampling is a method where each member of the population has an equal chance of being selected for the sample. It involves selecting individuals randomly, often using random number generators or lottery-type methods. For example, when analyzing the properties of a...
Discharge Summary Forms
Here's a detailed look at the key components and guidelines for preparing a discharge summary:
Design Example: Aggregate Gradation
The grading, or particle-size distribution, of sand is determined using sieve analysis, with standard sizes ranging from 150 μm to 10 mm (ASTM No. 100 sieve to 3⁄8 in. sieve). Sand is sampled...