Adhesion and host cell modulation: critical pathogenicity determinants of Bartonella henselae

Bettina Franz1, Volkhard A J Kempf

  • 1University Hospital of the Johann Wolfgang Goethe-University, Institute for Medical Microbiology and Infection Control, Frankfurt am Main, Germany.

Parasites & Vectors
|April 15, 2011
PubMed

Related Concept Videos

Colonisation of Pathogens01:25

Colonisation of Pathogens

Pathogen colonization of host tissues is a critical step in the development of infectious diseases. Various pathogenic microorganisms, including bacteria, fungi, viruses, and protozoa, have evolved complex strategies to attach to, invade, and persist within host environments. These mechanisms enable pathogens to establish infections, evade immune responses, and resist antimicrobial treatments.Attachment to Host CellsIn bacteria, colonization typically begins with adherence to host epithelial...
Determinants of Bacterial Pathogenicity and Virulence01:20

Determinants of Bacterial Pathogenicity and Virulence

Pathogenic bacteria employ a variety of strategies to establish infections, including the secretion of extracellular enzymes that act as potent virulence factors. These enzymes facilitate bacterial colonization of host tissues and help evade immune surveillance. By targeting structural components of host tissues and interfering with immune mechanisms, these enzymes play a pivotal role in disease progression.Extracellular Enzymes Facilitating Tissue Invasion: Several bacterial pathogens secrete...
Adherens Junctions01:24

Adherens Junctions

Strong contact points between adjacent cells anchor them to each other, forming tissues. Such anchoring junctions are of two types –  adherens junctions and desmosomes. Adherens junctions are abundant in tissues such as  epithelium and endothelium, forming a continuous zone of adhesion called the adhesion belt. In other tissues, such as  heart muscle, they appear as clusters, linking the cells to produce coordinated heart muscle contraction.
Adherens Junctions are Dynamic
The endothelial cells...
Regulation of Bacterial Virulence01:28

Regulation of Bacterial Virulence

Pathogenic bacteria employ a range of regulatory mechanisms to modulate the expression of virulence genes in response to environmental and host-derived signals. These mechanisms ensure that virulence factors are expressed only under favorable conditions, thereby optimizing infection and survival strategies.Mechanisms of Virulence RegulationKey regulatory strategies include:Two-Component Systems: These consist of a membrane-bound sensor kinase and a cytoplasmic response regulator. Environmental...
Fimbriae, Pili, and Axial Filaments01:28

Fimbriae, Pili, and Axial Filaments

Fimbriae and pili are specialized bacterial surface structures that play pivotal roles in adhesion, genetic exchange, and motility. Composed primarily of pilin protein, these hairlike appendages are crucial for bacterial survival and pathogenicity in various environments.Fimbriae: Adhesion and PathogenicityFimbriae are fine, filamentous structures measuring 2–10 nanometers in diameter and are densely distributed on the bacterial cell surface. They facilitate bacterial adhesion to abiotic...
Microbial Interactions: Parasitism01:22

Microbial Interactions: Parasitism

Parasitism is a form of microbial interaction in which parasitic microbes exploit a host organism for nutrients and shelter, often at the host's expense. Unlike mutualistic relationships, where both organisms benefit, parasitism benefits only the parasite and harms the host.Classification of ParasitesMicrobial parasites are broadly classified based on their location relative to the host.Ectoparasites remain on the host’s surface, such as the skin or outer tissues, drawing nutrients...