NEMO/NLK phosphorylates PERIOD to initiate a time-delay phosphorylation circuit that sets circadian clock speed

Joanna C Chiu1, Hyuk Wan Ko, Isaac Edery

  • 1Department of Molecular Biology and Biochemistry, Rutgers University, Center for Advanced Biotechnology and Medicine, Piscataway, NJ 08854, USA.

Cell
|April 26, 2011
PubMed

Related Concept Videos

Circadian Rhythms and Gene Regulation02:19

Circadian Rhythms and Gene Regulation

The biological clock is involved in many aspects of regulating complex physiology in all animals. It was in 1935 when German zoologists, Hans Kalmus and Erwin Bünning, discovered the existence of circadian rhythm in Drosophila melanogaster. However, the internal molecular mechanisms behind the circadian clock remained a mystery until 1984, when Jeffrey C. Hall, Michael Rosbash, and Michael W. Young discovered the expression of the Per gene oscillating over a 24-hour cycle. In subsequent...
3.4K
Applications of RC Circuits01:22

Applications of RC Circuits

A relaxation oscillator is one of the applications of RC circuits. A neon lamp relaxation oscillator comprises a capacitor, a resistor, a voltage source, and a lamp. The lamp acts like an open circuit, with infinite resistance until the potential difference across the lamp reaches a specific voltage. At that voltage, the lamp acts like a short circuit with zero resistance, and the capacitor discharges through the lamp, thus producing light. Once the capacitor is fully discharged through the...
5.1K
Voltage Doubler Circuit01:23

Voltage Doubler Circuit

A voltage doubler circuit integrates two main components: a clamping section and a rectifier section. The clamping section consists of a capacitor (C1) and a diode (D1), whereas the rectifier section is equipped with another diode (D2) and capacitor (C2). This circuit produces an output voltage with twice the amplitude of the sinusoidal input voltage.
2.3K
Setting Time of Cement01:12

Setting Time of Cement

The setting time of cement refers to the process of cement paste transitioning from a plastic state to a solid state. This process is crucial in construction as it dictates the timeframe for concrete placement, compaction, and finishing. The onset of this solidification is termed the initial set, indicating when the paste becomes unworkable. The final set is when the paste has solidified completely, and further handling or manipulation can no longer affect its shape. The cement strength is...
1.2K