Related Experiment Video
Updated: Jun 2, 2026

Development and Validation of Chromium Getters for Solid Oxide Fuel Cell Power Systems
Published on: May 26, 2019
Pilot scale treatment of chromite ore processing residue using sodium sulfide in single reduction and coupled
Antonio Velasco1, Martha Ramírez, Sergio Hernández
1Dirección General del Centro Nacional de Investigación y Capacitación Ambiental, Instituto Nacional de Ecología. Av. San Rafael Atlixco 186, CP. 09340, México, DF Mexico. jvelasco@ine.gob.mx
Abstract:
Single Cr(VI) reduction and coupled reduction/stabilization (R/S) processes were evaluated at pilot scale to determine their effectiveness to treat chromite ore processing residue (COPR). Sodium sulfide was used as the reducing agent and cement, gypsum and lime were tested as the stabilizing agents. The pilot experiments were performed in a helical ribbon blender mixer with batches of 250 kg of COPR and mixing time up to 30 min. Na2S/Cr(VI) mass ratios of 4.6, 5.7 and 6.8 were evaluated in the single reduction process to treat COPR with Cr(VI) concentration of ≈4.2 g/kg. The R/S process was tested with a Na2S/Cr(VI) mass ratio of 5.7 and including stabilizing agents not exceeding 5% (w/w(COPR)), to treat COPR with a Cr(VI) content of ≈5.1g/kg. The single reduction process with a ratio of 6.8, reached Cr(VI) reduction efficiencies up to 97.6% in the first days, however these values decreased to around 93% after 380 days of storage. At this point the total Cr level was around 12.5 mg/L. Cr(VI) removal efficiencies exceeding 96.5% were reached and maintained during 380 days when the coupled R/S process was evaluated. Total Cr levels lower than 5 mg/l were attained at the initials days in all R/S batch tested, however after 380 days, concentrations below the regulatory limit were only found with gypsum (2%) as single agent and with a blend of cement (4%) and lime (1%). These results indicated that the coupled R/S process is an excellent alternative to stabilize COPR.
More Related Videos
15:19Development of Sulfidogenic Sludge from Marine Sediments and Trichloroethylene Reduction in an Upflow Anaerobic Sludge Blanket Reactor
Published on: October 15, 2015
11:14Two-way Valorization of Blast Furnace Slag: Synthesis of Precipitated Calcium Carbonate and Zeolitic Heavy Metal Adsorbent
Published on: February 21, 2017
Related Concept Videos
Sample Preparation for Analysis: Advanced Techniques
Acid digestion with strong acids is commonly used to dissolve inorganic materials that are insoluble (do not dissolve) in water. This method can be useful for...
Microbial Leaching
Preparation and Reactions of Sulfides
Reduction of Alkynes to trans-Alkenes: Sodium in Liquid Ammonia
When dissolved in liquid ammonia, an alkali metal, such as sodium, dissociates into a...
Scale-Up Processes
Precipitation and Co-precipitation