Hybrid-optimization algorithm for the management of a conjunctive-use project and well field design

Yung-Chia Chiu1, Tracy Nishikawa, Peter Martin

  • 1California Water Science Center, San Diego Project Office, U.S. Geological Survey, 4165 Spruance Rd., Suite 200, San Diego, CA 92101, USA. yungchiachiu@ntu.edu.tw

Ground Water
|June 4, 2011
PubMed

Related Concept Videos

Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
To address...
Methods of Medium Optimization01:28

Methods of Medium Optimization

Optimizing growth media enhances microbial proliferation and maximizes product yield. Statistical experimental design methodologies provide structured and reproducible approaches, offering progressively higher levels of robustness and efficiency.The One-Factor-at-a-Time (OFAT) MethodThe One-Factor-at-a-Time (OFAT) method involves adjusting a single variable while keeping all others constant. However, it cannot detect interactions between variables, often leading to suboptimal outcomes when...
Design Example: Design of an Irrigation Channel01:27

Design Example: Design of an Irrigation Channel

Trapezoidal channels are widely used in irrigation systems due to their cost-effectiveness and efficiency in conveying water. Trapezoidal channels feature a flat bottom and sloping sides, making them stable and easier to construct compared to other shapes. The bottom width and side slope ratio are determined based on the required flow capacity and site conditions. The side slope is kept gentle for unlined channels to prevent soil erosion.Hydraulic parameters in channel design include the flow...
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
Design Example: Dimensioning of Concrete Masonry Construction01:13

Design Example: Dimensioning of Concrete Masonry Construction

For the construction of a storeroom using concrete masonry units, it's essential to align the dimensions of the structure with the actual sizes of the blocks and the intended mortar joints. On the site in question, there's a stockpile of concrete masonry blocks with a nominal size of eight by eight by sixteen inches, which are to be used in the construction of the storeroom.
The site engineer has laid out a plan for the storeroom with external dimensions of twelve feet in length and eight feet...