Related Concept Videos

Cavity Drainage and Flashings in Masonry walls01:20

Cavity Drainage and Flashings in Masonry walls

Typically, a cavity wall consists of two wythes separated by a gap of at least 2 inches, which may contain insulation while still maintaining a minimum clear space of 1 inch to facilitate adequate drainage. Advanced methods like the insertion of a continuous drainage mat can further reduce this space while ensuring effective moisture expulsion.
Weep holes, strategically placed at the base of the cavity, are critical for draining accumulated water. These openings are created by leaving head...
Design Example: Forces in Sluice Gate01:11

Design Example: Forces in Sluice Gate

In hydraulic engineering, sluice gates are essential for managing water flow through channels, reservoirs, and irrigation systems. Sluice gates, acting as vertical barriers, regulate water by adjusting the gate's opening height, which changes the velocity and pressure of water flowing beneath the gate. Understanding the forces involved is crucial to designing sluice gates that can withstand dynamic pressure differences, especially when the gate is closed or partially open.
Key variables in...
PPE Use in Healthcare Settings I: Donning01:22

PPE Use in Healthcare Settings I: Donning

Donning PPE must be completed before contact with the patient. This process protects from infectious agents. The sequence and action included in each donning are critical, and the steps must be systematic to avoid exposure to pathogens. The institutional policy also needs to be followed while donning PPE. The pre-donning preparations are gathering equipment, inspecting the PPE equipment for tears, holes, or damage, removing jewelry, removing any garments below the elbows, and tying the hair...
Types of Building Separation Joints01:23

Types of Building Separation Joints

Building separation joints divide large or complex building structures into smaller, discrete units that can move independently. These joints are categorized into three types: volume-change joints, settlement joints, and seismic separation joints.
Volume-change joints address the effects of expansion and contraction due to temperature and moisture variations. They are strategically placed at discontinuities in a building's mass where cracking is most likely and are spaced about 150 to 200 feet...
Masonry Curtain Walls01:20

Masonry Curtain Walls

Masonry curtain walls employ brick or stone veneers supported by the building's structure to form an external cladding system that is both aesthetically appealing and functional. These walls are erected through two principal techniques, first by traditional layering of masonry units and second by using prefabricated panels. Traditional construction relies on steel shelf angles attached to the spandrel beam for support, with high-bond mortars ensuring secure attachment of masonry veneer units.
PPE Use in Healthcare Settings II: Doffing01:10

PPE Use in Healthcare Settings II: Doffing

The sequence of removing or doffing PPE starts with the gloves, as they are the most contaminated. Next is removal of the face shield or goggles, as they would interfere with removing other PPE. Then remove the gown, followed by the mask or respirator. Perform hand hygiene between steps if hands become contaminated and immediately after removing all PPE. Generally, the outside front and sleeves of the isolation gown, the goggles or the mask, the respirator, and the face shield are contaminated.