Nitrogen and potassium variation on contaminant removal for a vertical subsurface flow lab scale constructed wetland
Related Experiment Video
Updated: May 31, 2026

Mesocosm-Scale Constructed Wetland Design for Wastewater Treatment
Published on: May 2, 2025
Miguel Angel Orduña Bustamante1, Mabel Vaca Mier, José Alberto Escalante Estrada
1Programa de Maestría y Doctorado en Ingeniería, Universidad Nacional Autónoma de México, Mexico City, Mexico. obmiguel@yahoo.com
Abstract:
Lab scale constructed wetlands were used to evaluate organic load removal efficiency. Bioreactors were fed with synthetic wastewater (SW) with varying concentrations of nitrogen and potassium. Reactors were planted with species Phragmites australis. Fed theoretic COD was adjusted to 240.0mg-O(2)L(-1), nitrogen levels were 10 and 40 mg-NL(-1) (ammonium sulfate), potassium levels were 5 and 31 mg-KL(-1) (potassium monobasic phosphate). The higher biomass yield, for 0.5 and 0.775 N:K ratios, was related with higher organic load removal. The ratio N:K showed significant differences for organic load abatement, when 1:0.5 and 1:0.775 N:K ratios were applied, 96.8% efficiency was obtained, whereas N:K ratio of 1:0.125 had efficiency of 92.1% and N:K ratio of 1:3.1 showed an efficiency of 90.5%. For planted bioreactor E(H) decreased in 162.7 mV from sample port to 5 cm down to 35 cm depth, while for the bioreactor without plant showed an E(H) decrement of only 17.7 mV.
Related Concept Videos
Microbial Wastewater Treatment
Biological Treatment of Effluent and Waste Water

