Dump truck-related deaths in construction, 1992-2007
Michael McCann1, Mei-Tai Cheng
1CPWR-The Center for Construction Research and Training, Silver Spring, Maryland, USA. michael.mccann@att.net
Background:
Dump trucks are universally used in construction and other industries to haul materials to the location and to remove waste materials.
Methods:
The source for dump truck-related fatality data was the Bureau of Labor Statistics Census of Fatal Occupational Injuries (CFOI) Research File.
Results:
From 1992 to 2007, 829 construction workers were killed in dump truck-related incidents nationwide. Of those, 336 were dump truck operators with 215 deaths occurring in street and highway incidents. Another 343 deaths involved workers on foot, three-quarters struck by dump trucks. Sixty-four of the construction workers killed were maintaining dump trucks, 22 when caught between the truck frame and a falling dump truck bed. Of the 86 other deaths, 55 involved streets and highways.
Conclusions:
Recommendations include: (i) improving the reporting of seat belt usage in fatality reports; (ii) requiring use of seat belts; (iii) requiring the use of backup alarms, spotters, or other methods to alert dump truck operators to workers in their blind spots; (iv) prohibiting direct dumping at river banks and embankments; (v) using cameras or radar to enforce stopping at railway crossings; and (xi) enforcing worker safety practices (e.g., lockout/tagout procedures on elevated dump truck beds).
Related Concept Videos
Survey Safety
Pumped Concrete
For direct-acting pumps, the concrete enters the pump via the inlet valve under the action of gravity and suction created by the movement of the piston. This concrete is then forced into the pipeline and out through the outlet valve by the forward movement...
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the block.
Compacting Factor test
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
Slump Test
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
Hazard Rate