Related Experiment Video
Updated: May 25, 2026

10:28
Herbivore-induced Blueberry Volatiles and Intra-plant Signaling
Published on: December 18, 2011
Volatile dose and exposure time impact perception in neighboring plants
P Saraí Girón-Calva1, Jorge Molina-Torres, Martin Heil
1Departamento de Ingeniería Genética, CINVESTAV-Irapuato, Irapuato, Guanajuato, Mexico.
Journal of Chemical Ecology
|February 14, 2012
Summary
Plants use airborne chemical signals to warn neighbors of danger. Lima beans exposed to specific plant volatiles for longer periods developed enhanced resistance to bacterial pathogens.
Area of Science:
- Plant biology
- Chemical ecology
- Plant pathology
Background:
- Stressed plants emit volatiles that can trigger defense mechanisms in neighboring plants.
- The precise mechanisms by which plants perceive these airborne signals and translate them into internal defense responses are not fully understood.
Purpose of the Study:
- To investigate how lima beans perceive and respond to specific volatile organic compounds (VOCs).
- To determine the effect of different concentrations and exposure durations of nonanal and methyl salicylate (MeSA) on plant resistance to Pseudomonas syringae.
Main Methods:
- Lima bean plants (Phaseolus lunatus L.) were exposed to varying concentrations of nonanal and MeSA for 6 or 24 hours.
- Resistance to the bacterial pathogen Pseudomonas syringae was assessed after volatile exposure.
Main Results:
- Exposure to nonanal significantly increased resistance to P. syringae after both 6 and 24 hours.
- Low concentrations of MeSA only enhanced resistance after 24 hours of exposure, suggesting a time-dependent response.
- Longer exposure to MeSA resulted in high, indistinguishable levels of resistance across tested concentrations, indicating volatile accumulation.
Conclusions:
- Plant-plant signaling via volatiles is influenced by exposure duration.
- The accumulation of volatiles in the receiver plant is likely a key factor in inducing resistance.
- Specific volatiles like MeSA require prolonged exposure to elicit significant resistance against pathogens.
Related Concept Videos
Photoreceptors and Plant Responses to Light
Light plays a significant role in regulating the growth and development of plants. In addition to providing energy for photosynthesis, light provides other important cues to regulate a range of developmental and physiological responses in plants.
Biological Clocks and Seasonal Responses
The circadian—or biological—clock is an intrinsic, timekeeping, molecular mechanism that allows plants to coordinate physiological activities over 24-hour cycles called circadian rhythms. Photoperiodism is a collective term for the biological responses of plants to variations in the relative lengths of dark and light periods. The period of light-exposure is called the photoperiod.
Responses to Heat and Cold Stress
Every organism has an optimum temperature range within which healthy growth and physiological functioning can occur. At the ends of this range, there will be a minimum and maximum temperature that interrupt biological processes.
Responses to Drought and Flooding
Water plays a significant role in the life cycle of plants. However, insufficient or excess of water can be detrimental and pose a serious threat to plants.
Responses to Salt Stress
Salt stress—which can be triggered by high salt concentrations in a plant’s environment—can significantly affect plant growth and crop production by influencing photosynthesis and the absorption of water and nutrients.
Factors Affecting Perception
Perception is influenced by perceptual set, context, motivation, and emotion. Perceptual set, or perceptual expectancy, refers to the tendency to perceive things in a particular way, influenced by previous experiences and expectations. This phenomenon affects the interpretation of stimuli, creating a set of mental tendencies and assumptions that impact sensory perceptions of sound, taste, touch, and sight.
An illustrative example of a perceptual set is the scenario where an airline pilot told...
An illustrative example of a perceptual set is the scenario where an airline pilot told...

