Related Experiment Video
Updated: May 24, 2026

12:30
Use of Galleria mellonella as a Model Organism to Study Legionella pneumophila Infection
Published on: November 22, 2013
Legionella-associated lung abscess: Critical pathogen or minor isolate?
1Division of Infectious Diseases, Department of Medicine, University of British Columbia and Vancouver General Hospital, Vancouver, British Columbia.
Summary
Legionella species can cause lung abscesses, sometimes with other bacteria. Specific Legionella treatment aided recovery in one case, but another patient died despite therapy, highlighting complex outcomes in these infections.
Area of Science:
- Infectious Diseases
- Pulmonology
- Microbiology
Background:
- Lung abscesses are serious infections, and Legionella species have been implicated in some cases.
- Previous studies suggest a link between Legionella-associated lung abscesses and corticosteroid use.
- The role of co-infecting bacteria in Legionella-induced lung abscesses is not well understood.
Related Concept Videos
Atypical Pneumonia
Atypical pneumonia, often caused by Mycoplasma pneumoniae, is a form of pulmonary infection that differs from the classical presentation of bacterial pneumonia in both its cause and clinical symptoms. Mycoplasma pneumoniae is a pleomorphic bacterium notable for its lack of a rigid cell wall. This structural characteristic imparts resistance to beta-lactam antibiotics and significantly influences the bacterium’s behavior within the human host.Other pathogens responsible for the disease include...
Pneumonia I: Introduction
Pneumonia is an infection of the lower respiratory tract that leads to inflammation of the lung parenchyma, often resulting in the accumulation of inflammatory exudate in the alveoli and airways. Unlike the watery, low-protein fluid exudate in pulmonary edema, the exudate in this case is a thick fluid rich in immune cells, proteins, and debris produced during infection and inflammation.This impairs gas exchange and can lead to consolidation of lung tissue. The infection may be caused by a...
Pneumonia I: Introduction
Pneumonia is an acute respiratory infection that targets the lungs, specifically the alveoli. These tiny air sacs, essential for oxygen exchange, become engorged with pus and fluid, severely hindering breathing, decreasing oxygen absorption, and causing significant pain and discomfort during respiration.
Risk Factors
Various factors influence the likelihood of developing pneumonia. Age plays a crucial role, with infants, children under two, and individuals over 65 at increased risk due to their...
Risk Factors
Various factors influence the likelihood of developing pneumonia. Age plays a crucial role, with infants, children under two, and individuals over 65 at increased risk due to their...
Microbiota of the Respiratory Tract
The human respiratory tract, comprising the upper and lower segments, serves as a critical interface with the external environment. The upper respiratory tract (URT)—including the nostrils, sinuses, pharynx, and oropharynx—is heavily colonized by microbes, while the lower respiratory tract (LRT), composed of the larynx, trachea, bronchi, and lungs, was long thought to be sterile. However, recent molecular studies have revealed that the lungs are not devoid of microbes but act more like...
Bacterial Phylum Spirochaetes
Spirochetes, unique bacteria in the phylum Spirochaetes, are gram-negative, motile, tightly coiled, slender, and flexible. They inhabit aquatic sediments and animals, with some causing diseases like syphilis. Spirochetes are classified into eight genera based on habitat, pathogenicity, phylogeny, and characteristics.Their distinctive motility arises from endoflagella, located within the cell’s periplasm. These endoflagella anchor at the cell poles and extend along the cell length, encased by a...
Colonisation of Pathogens
Pathogen colonization of host tissues is a critical step in the development of infectious diseases. Various pathogenic microorganisms, including bacteria, fungi, viruses, and protozoa, have evolved complex strategies to attach to, invade, and persist within host environments. These mechanisms enable pathogens to establish infections, evade immune responses, and resist antimicrobial treatments.Attachment to Host CellsIn bacteria, colonization typically begins with adherence to host epithelial...
