Related Experiment Video
Updated: May 22, 2026

Removal of Arsenic Using a Cationic Polymer Gel Impregnated with Iron Hydroxide
Published on: June 28, 2019
Bangladesh arsenic mitigation programs: lessons from the past
Abul Hasnat Milton1, Samar Kumar Hore, Mohammad Zahid Hossain
1Centre of Clinical Epidemiology and Biostatistics, School of Medicine and Public Health, University of Newcastle, NSW, Australia.
Abstract:
Ensuring access to safe drinking water by 2015 is a global commitment by the Millennium Development Goals (MDGs). In Bangladesh, significant achievements in providing safe water were made earlier by nationwide tubewell-installation programme. This achievement was overshadowed in 1993 by the presence of arsenic in underground water. A total of 6 million tubewells have been tested for arsenic since then, the results of which warranted immediate mitigation. Mitigation measures included tubewell testing and replacing; usage of deeper wells; surface water preservation and treatment; use of sanitary dug wells, river sand and pond sand filters; rainwater collection and storage; household-scale and large-scale arsenic filtrations; and rural pipeline water supply installation. Shallow tubewell installation was discouraged. Efforts have been made to increase people's awareness. This paper describes the lessons learned about mitigation efforts by the authors from experience of arsenic-related work. In spite of national mitigation plans and efforts, a few challenges still persist: inadequate coordination between stakeholders, differences in inter-sectoral attitudes, inadequate research to identify region-specific, suitable safe water options, poor quality of works by various implementing agencies, and inadequate dissemination of the knowledge and experiences to the people by those organizations. Issues such as long-time adaptation using ground water, poor surface water quality including bad smell and turbidity, and refusal to using neighbor's water have delayed mitigation measures so far. Region-specific mitigation water supply policy led by the health sector could be adopted with multisectoral involvement and responsibility. Large-scale piped water supply could be arranged through Public Private Partnerships (PPP) in new national approach.
More Related Videos
10:05Integrated Field Lysimetry and Porewater Sampling for Evaluation of Chemical Mobility in Soils and Established Vegetation
Published on: July 4, 2014
09:51TD-DFT Guided Advanced E-Eye Sensing Technique for On-site Quantification of Fe, Cr, F, and As in the Environmental, Biological, and Food Samples
Published on: September 19, 2025
Related Concept Videos
Pharmaceutical Poisoning: Treatment Strategies
Pharmaceutical Poisoning: Potential Scenarios
Microbial Bioremediation of Uranium
Microbial Leaching
Production of Biopesticides
Acid Mine Drainage