Critical pathogenic events underlying progression of neurodegeneration in glaucoma

David J Calkins1

  • 1Department of Ophthalmology and Visual Sciences, The Vanderbilt Eye Institute, Vanderbilt University School of Medicine, 11435 MRB IV, 2215B Garland Avenue, Nashville, TN 37232, USA. david.j.calkins@vanderbilt.edu

Related Concept Videos

Glaucoma: Overview01:25

Glaucoma: Overview

Glaucoma is an eye condition characterized by increased intraocular pressure that damages the retina and optic nerve, leading to irreversible blindness if left untreated. The human eye has various components, including the cornea, iris, pupil, lens, and optic nerve. Aqueous humor is secreted by the epithelium of the ciliary body in the posterior chamber and flows through the trabecular meshwork and canal of Schlemm, maintaining normal intraocular pressure. The trabecular meshwork and the canal...
Increased Intracranial Pressure ll: Pathophysiology01:29

Increased Intracranial Pressure ll: Pathophysiology

Increased intracranial pressure (ICP) refers to a potentially life-threatening rise in pressure inside the skull. This usually happens when there is a major change in the volume of brain tissue, blood, or cerebrospinal fluid (CSF) — the three components inside the skull. According to the Monro-Kellie doctrine, if the volume of one component increases, the volumes of the other components must decrease to maintain normal pressure. If this does not happen, ICP rises.The process often begins with...
Open Angle Glaucoma: Treatment01:27

Open Angle Glaucoma: Treatment

In open-angle glaucoma, the iridocorneal angle remains open, but the trabecular meshwork becomes stiff, slowing down the outflow of aqueous humor. This causes a buildup of aqueous humor in the anterior chamber, leading to a sudden increase in intraocular pressure. The treatment for open-angle glaucoma focuses on reducing the elevated intraocular pressure by either decreasing the secretion of aqueous humor or increasing its outflow.
Drugs such as carbonic anhydrase inhibitors, α2- and...
Angle Closure Glaucoma: Treatment01:28

Angle Closure Glaucoma: Treatment

Angle-closure glaucoma, or closed-angle glaucoma, is an eye condition where the iris bulges out and blocks the iridocorneal angle, resulting in a buildup of aqueous humor and increased intraocular pressure. Immediate medical attention is necessary due to the sudden onset of symptoms. The treatment for angle-closure glaucoma includes short-term and long-term approaches. Short-term treatment involves using eye drops like pilocarpine to lower intraocular pressure by increasing aqueous humor...
Diabetic Retinopathy01:27

Diabetic Retinopathy

DefinitionDiabetic retinopathy is a microvascular complication of diabetes affecting the retinal blood vessels.Risk FactorsDiabetic retinopathy is present in almost all individuals with type 1 diabetes and more than 60% of those with type 2 diabetes after two decades of disease.The risk increases with poor glycemic control, hypertension, dyslipidemia, smoking, pregnancy, and puberty.Although cataracts and glaucoma are also more frequent in people with diabetes, retinopathy remains the leading...
Parkinson Disease ll: Pathophysiology01:24

Parkinson Disease ll: Pathophysiology

Parkinson disease (PD) is a progressive neurodegenerative disorder primarily affecting movement, with additional non-motor features. Its pathophysiology involves complex interactions among genetic susceptibility, environmental exposures, and cellular dysfunction, including dopaminergic neuron loss, protein aggregation, and mitochondrial impairment.Selective NeurodegenerationA key feature is the degeneration of dopaminergic neurons in the substantia nigra pars compacta, leading to reduced...