Related Experiment Video
Updated: May 16, 2026

Improved Renal Denervation Mitigated Hypertension Induced by Angiotensin II Infusion
Published on: May 26, 2022
Should nicorandil infusion be adapted in dialysis-dependent patients undergoing continuous renal replacement therapy
Norihisa Yasuda1, Koji Goto, Ryo Shitomi
1Department of Anesthesiology and Intensive Care, Faculty of Medicine, Oita University, Yufu City, Oita, Japan. yasu@oita-u.ac.jp
Abstract:
In this report, we studied whether plasma concentration of nicorandil is maintained effectively and safely in dialysis-dependent patients with stage 5 chronic kidney disease (CKD5D) undergoing continuous renal replacement therapy (CRRT). Participants consisted of 10 patients undergoing CRRT after cardiac surgery. CRRT was performed with an effluent flow rate of either 600 mL/h (low-flow group; n = 5) or 1800 mL/h (high-flow group; n = 5). Nicorandil was infused intravenously at 0.1 mg/kg/h for more than 15 h starting 8 h before and 7 h after the start of CRRT. Plasma nicorandil concentrations were measured from arterial blood lines 1 h before and 7 h after CRRT initiation. Nicorandil clearance by CRRT was also calculated 1 h after CRRT initiation. Nicorandil plasma concentrations before and 7 h after CRRT initiation were 68.0 ng/mL and 74.6 ng/mL, respectively. Nicorandil clearance 1 h after CRRT initiation was 20.2 mL/min. Increasing the effluent flow rate from 600 mL/h to 1800 mL/h tended to increase nicorandil clearance. When nicorandil was infused intravenously during CRRT at 0.1 mg/kg/h in patients with CKD5D, plasma nicorandil concentrations were maintained within an effective concentration range.
Related Concept Videos
Continuous Renal Replacement Therapy
Heart Failure Drugs: Inhibitors of Renin-Angiotensin System
Cardiac Catheterization I: Pre-Procedure Overview
Extracorporeal Removal of Drugs: Continuous Renal Replacement Therapy
Drug Dosing in Renal Diseases: Dose Adjustments Based on Drug Clearance and Elimination Rate Constant
Acute Kidney Injury VI: Nursing Management