iRHOM2 is a critical pathogenic mediator of inflammatory arthritis

Priya Darshinee A Issuree1, Thorsten Maretzky, David R McIlwain

  • 1Arthritis and Tissue Degeneration Program, Autoimmunity and Inflammation Program, Hospital for Special Surgery, Weill Cornell University, New York, New York, USA.

Related Concept Videos

T Cell Types and Functions01:24

T Cell Types and Functions

When T cells with CD4 markers are activated, they give rise to two types of effector cells: helper T cells and regulatory T cells. Meanwhile, T cells with CD8 markers differentiate into effector cytotoxic T cells. The differentiation of CD4 T cells into helper T cell subsets, such as Th1, Th2, and Th17 cells, is dependent on the antigen type, antigen-presenting cell, and regulatory cytokines.
Th1 cells stimulate dendritic cells to express necessary co-stimulatory molecules on their surfaces for...
Rheumatic Heart Disease I: Introduction01:23

Rheumatic Heart Disease I: Introduction

Rheumatic heart disease or RHD is a chronic condition that results from rheumatic fever, causing permanent damage to the heart valves.Etiology and Risk FactorsIt primarily arises from rheumatic fever, an inflammatory disease that can develop after untreated or inadequately treated group A streptococcal (GAS) pharyngitis. Streptococcus spreads through direct contact with oral or respiratory secretions. While the bacteria are the causative agents, factors like malnutrition, overcrowding, poor...
Acute Inflammation I: Inflammatory Response01:26

Acute Inflammation I: Inflammatory Response

Acute inflammation is a rapid, short-lived physiological response to tissue injury or infection, designed to eliminate harmful agents and initiate repair. This tightly regulated process typically lasts from minutes to several days and is triggered by factors such as microbial invasion, physical trauma, or chemical injury.Recognition and Mediator ReleaseThe inflammatory response begins when resident immune cells—such as mast cells, macrophages, and dendritic cells—detect damage-associated...
Inflammatory Bowel Disease III: Crohn's Disease01:25

Inflammatory Bowel Disease III: Crohn's Disease

Crohn’s disease is a chronic, relapsing form of inflammatory bowel disease characterized by segmental, transmural inflammation that can affect any part of the gastrointestinal tract. Its pathogenesis arises from a combination of genetic susceptibility, environmental exposures, epithelial barrier dysfunction, and immune dysregulation. Together, these factors lead to an exaggerated immune response against components of the gut microbiome.Genetic and Environmental InfluencesMultiple genetic...
Chronic Inflammation: Introduction01:12

Chronic Inflammation: Introduction

Chronic inflammation is a prolonged, dysregulated immune response that persists for weeks to years when the inciting stimulus is difficult to eradicate or when self‑antigens drive ongoing reactivity. Morphologically, it is defined by mononuclear cell infiltration, progressive tissue destruction, and concurrent attempts at healing via angiogenesis and fibrosis. Compared with acute inflammation, edema is less prominent while cellular infiltration predominates; triggers include persistent...
Acute Inflammation III: Local and Systemic Effects01:25

Acute Inflammation III: Local and Systemic Effects

Acute inflammation produces a coordinated set of local and systemic changes that limit injury, eliminate pathogens, and initiate repair. These responses arise within minutes of infection, trauma, or chemical insult and are driven by vascular alterations and leukocyte-derived mediators. When the stimulus resolves, the reaction typically abates within days.Local EffectsAt the site of injury, arteriolar vasodilation increases blood flow, resulting in redness and warmth. Simultaneously, increased...