Spanish version of Bus Drivers' Job Demands Scale (BDJD-24)

Joan Boada-Grau1, Aldo-Javier Prizmic-Kuzmica, Marcos-David González-Fernández

  • 1Facultad de Ciencias de la Educación y Psicología, Universidad Rovira i Virgili, 43005 Tarragona, Spain. joan.boada@urv.cat

Psicothema
|May 1, 2013
PubMed
Abstract

Related Concept Videos

Survey Safety01:28

Survey Safety

Surveying near highways, rough terrain, or power lines involves significant risks. Working along highways is particularly dangerous and requires the use of warning signs and flagmen. It is safest to avoid working directly on roads and use offsets whenever possible. When highway work is unavoidable, it must follow all safety guidelines. Surveyors should wear bright clothing, such as orange reflective vests, to ensure visibility to motorists, coworkers, and hunters. In construction zones, wearing...
Sight Distance in a Vertical Curve01:29

Sight Distance in a Vertical Curve

Sight distance on vertical curves is critical in roadway design. It ensures drivers can see far enough ahead to identify and respond to hazards effectively. This directly impacts safety, driver comfort, and the overall efficiency of the transportation network.Vertical curves are classified into crest and sag curves based on their geometry. For crest curves, sight distance is determined by the line of sight between a driver's eye and a small object on the road's surface. Design parameters for...
Bus Impedance Matrix01:24

Bus Impedance Matrix

Calculating subtransient fault currents for three-phase faults in an N-bus power system involves using the positive-sequence network. When a three-phase short circuit occurs at a specific bus, the analysis uses the superposition method to evaluate two separate circuits.
In the first circuit, all machine voltage sources are short-circuited, leaving only the prefault voltage source at the fault location. The positive-sequence bus impedance matrix can be determined by solving the nodal equations,...
Differential Leveling01:12

Differential Leveling

Differential leveling is a precise method in surveying used to determine the elevation difference between two points. Its primary goal is to establish accurate vertical measurements to create level surfaces or grade lines critical for designing and constructing infrastructures such as roads, bridges, and buildings.The procedure for differential leveling begins with setting up and leveling the instrument at a point where the benchmark can be seen. The level rod is held on the benchmark (BM), and...
Friction: Problem Solving01:21

Friction: Problem Solving

Friction is an essential force that influences the motion of objects in daily life. Depending on the situation, it can be either beneficial or problematic. Consider a bus with a mass of three megagrams and its center of mass at a specific point, moving along a banked road at a constant speed. The coefficient of static friction between the tires and the road is 0.5. Find the maximum angle of the banked road at which the bus would not slip or tip.
Initially, a visual representation of the...
Profile Leveling and Cross Sections01:26

Profile Leveling and Cross Sections

Profile leveling and cross-sections are surveying methods used to determine and document terrain elevations for infrastructure projects such as highways, railroads, canals, and pipelines. These methods provide data for earthwork planning and alignment of proposed routes.  Profile leveling involves measuring elevations along a fixed line to create a vertical terrain profile. A surveyor sets up a leveling instrument at the benchmark (BM) and records a backsight (BS) to determine the instrument's...