Assessment of stakeholder perceptions in water infrastructure projects using system-of-systems and binary probit

Kasey Faust1, Dulcy M Abraham, Dan DeLaurentis

  • 1School of Civil Engineering, Purdue Univ., 550 Stadium Mall Dr., West Lafayette, IN 47907-2051, USA. faustk@purdue.edu

Related Concept Videos

Multiple Pipe Systems01:21

Multiple Pipe Systems

Multipipe systems consist of complex configurations of interconnected pipes designed to transport fluids efficiently across intricate networks. They are essential in engineering applications requiring precise control over flow distribution, pressure, and head loss. They are categorized into series, parallel, loop, and network configurations, each distinguished by unique flow characteristics and applications.
Series Configuration
In a series configuration, fluid flows sequentially from one pipe...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
Typical Model Studies01:30

Typical Model Studies

Fluid mechanics model studies often utilize scaled-down systems to predict fluid behavior in full-scale environments, such as river flows, dam spillways, and structures interacting with open surfaces. Maintaining Froude number similarity in river models is crucial, as it replicates surface flow features like wave patterns and velocities.
Single Pipe Systems01:24

Single Pipe Systems

In pipe flow analysis, problems are typically categorized into three types — Type I, Type II, and Type III — based on the known parameters and the desired outcome. Each type of problem addresses specific engineering requirements using fluid properties, pipe characteristics, and operational conditions.
In a Type I problem, fluid properties (density and viscosity), pipe characteristics (including diameter, length, and surface roughness), and the flow rate or average velocity are known. The...
Weir: Problem Solving01:26

Weir: Problem Solving

Water flow in open channels is often measured using hydraulic structures such as weirs, which allow precise calculation of discharge. In a rectangular channel, flow rates are measured using three types of weirs: rectangular sharp-crested, triangular sharp-crested, and broad-crested. The weir head is set at a fixed height above the channel bottom, simplifying calculations and enabling the relationship between depth and flow rate to be analyzed.For the rectangular sharp-crested weir, the flow...
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...