Dominant functional group effects on the invasion resistance at different resource levels

Jiang Wang1, Yuan Ge, Chong B Zhang

  • 1School of Life Science, Taizhou University, Linhai, China.

Plos One
|October 30, 2013
PubMed
Abstract

Related Concept Videos

Quantitative Aspects of Drug-Receptor Interaction01:30

Quantitative Aspects of Drug-Receptor Interaction

The receptor occupancy theory connects a drug's response to the number of occupied receptors. With higher drug concentrations, more receptors are occupied, leading to increased responses. The formation of drug-receptor complexes involves association and dissociation rates, which reach equilibrium when the forward and backward reactions are equal. The equilibrium association constant (Ka) and its inverse, the equilibrium dissociation constant (Kd), indicate drug affinity. Higher Ka and lower...
2.2K
Microbial Interactions: Competition01:26

Microbial Interactions: Competition

Microbial competition is an ecological interaction in which microorganisms vie for limited resources within shared environments. These resources may include nutrients, space, or light, depending on the system. The intensity and outcome of competition are influenced by the environmental context, such as nutrient availability, spatial constraints, and the diversity of microbial species present. These competitive interactions significantly influence the structure, function, and resilience of...
98
Ecological Niches02:02

Ecological Niches

All organisms have a position within an ecosystem. The complete set of living and nonliving factors—including food resources, climate, and terrain—that define the position of a given organism are collectively referred to as the organism’s ecological niche.
22.4K
Gene Regulation in Microbial Communities: Quorum Sensing01:28

Gene Regulation in Microbial Communities: Quorum Sensing

Quorum sensing is a mechanism of bacterial communication that enables coordinated gene expression in response to changes in population density. This facilitates collective behaviors that enhance survival, resource acquisition, and ecological adaptation. This process relies on small signaling molecules called autoinducers that accumulate as bacterial populations grow. When a critical threshold concentration of autoinducers is reached, bacterial cells collectively modify gene expression,...
966
Colonisation of Pathogens01:25

Colonisation of Pathogens

Pathogen colonization of host tissues is a critical step in the development of infectious diseases. Various pathogenic microorganisms, including bacteria, fungi, viruses, and protozoa, have evolved complex strategies to attach to, invade, and persist within host environments. These mechanisms enable pathogens to establish infections, evade immune responses, and resist antimicrobial treatments.Attachment to Host CellsIn bacteria, colonization typically begins with adherence to host epithelial...
103
Microbial Interactions: Parasitism01:22

Microbial Interactions: Parasitism

Parasitism is a form of microbial interaction in which parasitic microbes exploit a host organism for nutrients and shelter, often at the host's expense. Unlike mutualistic relationships, where both organisms benefit, parasitism benefits only the parasite and harms the host.Classification of ParasitesMicrobial parasites are broadly classified based on their location relative to the host.Ectoparasites remain on the host’s surface, such as the skin or outer tissues, drawing nutrients...
121