Tree biomass estimation of Chinese fir (Cunninghamia lanceolata) based on Bayesian method

Xiongqing Zhang1, Aiguo Duan, Jianguo Zhang

  • 1State Key Laboratory of Tree Genetics and Breeding, Key Laboratory of Tree Breeding and Cultivation of the State Forestry Administration, Research Institute of Forestry, Chinese Academy of Forestry, Beijing, People's Republic of China.

Plos One
|November 27, 2013
PubMed

Related Concept Videos

Estimation of the Physical Quantities01:05

Estimation of the Physical Quantities

On many occasions, physicists, other scientists, and engineers need to make estimates of a particular quantity. These are sometimes referred to as guesstimates, order-of-magnitude approximations, back-of-the-envelope calculations, or Fermi calculations. The physicist Enrico Fermi was famous for his ability to estimate various kinds of data with surprising precision. Estimating does not mean guessing a number or a formula at random. Instead, estimation means using prior experience and sound...
6.7K
Survival Tree01:19

Survival Tree

Survival trees are a non-parametric method used in survival analysis to model the relationship between a set of covariates and the time until an event of interest occurs, often referred to as the "time-to-event" or "survival time." This method is particularly useful when dealing with censored data, where the event has not occurred for some individuals by the end of the study period, or when the exact time of the event is unknown.
 Building a Survival Tree
Constructing a...
514
Estimating Population Mean with Known Standard Deviation01:16

Estimating Population Mean with Known Standard Deviation

To construct a confidence interval for a single unknown population mean μ, where the population standard deviation is known, we need sample mean as an estimate for μ and we need the margin of error. Here, the margin of error (EBM) is called the error bound for a population mean (abbreviated EBM). The sample mean is the point estimate of the unknown population mean μ.
The confidence interval estimate will have the form as follows:
(point estimate - error bound, point estimate +...
7.5K