Preparation of Aligned Steel Fiber Reinforced Cementitious Composite and Its Flexural Behavior
Published on: June 27, 2018
Ductility enhancement of post-Northridge connections by multilongitudinal voids in the beam web
Sepanta Naimi1, Murude Celikag, Amir A Hedayat
1Department of Civil Engineering, Istanbul Aydin University, Florya Main Campus, İnönü Street, Sefaköy-Küçükçekmece, 34295 Istanbul, Turkey.
Abstract:
Since the earthquakes in Northridge and Kobe in 1994 and 1995, respectively, many investigations have been carried out towards improving the strength and ductility of steel beam to column pre- and post-Northridge connections. In order to achieve these objectives, recent researches are mainly focused on three principles: reducing the beam section to improve the beam ductility, adding different kinds of slit damper to beam and column flanges to absorb and dissipate the input earthquake energy in the connection and strengthening the connection area using additional elements such as rib plates, cover plates, and flange plates to keep the plastic hinges away from the column face. This paper presents a reduced beam section approach via the introduction of multilongitudinal voids (MLV) in the beam web for various beam depths varying from 450 mm to 912 mm. ANSYS finite element program was used to simulate the three different sizes of SAC sections: SAC3, SAC5, and SAC7. Results showed an improvement in the connection ductility since the input energy was dissipated uniformly along the beam length and the total rotation of the connection was over four percent radian.
Related Concept Videos
Deformation of a Beam under Transverse Loading
The insights from the bending moment diagram extend to...
Plastic Deformations
Plastic Deformations
Design of Prismatic Beams for Bending
Posttensioned Masonry Walls
Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...
Design Example: Distributing Reinforcements in Concrete Sections