Related Experiment Video
Updated: May 4, 2026

Isolation and Screening from Soil Biodiversity for Fungi Involved in the Degradation of Recalcitrant Materials
Published on: May 16, 2022
Electroremediation of a natural soil polluted with phenanthrene in a pilot plant
R López-Vizcaíno1, J Alonso2, P Cañizares1
1Department of Chemical Engineering, Facultad de Ciencias y Tecnologías Químicas, University of Castilla-La Mancha, Campus Universitario s/n, 13071 Ciudad Real, Spain.
Abstract:
In this work, a pilot plant with two rows of three electrodes in semipermeable electrolyte wells was used to study the electrokinetic treatment of a natural soil polluted with phenanthrene (PHE). The electrokinetic pilot plant was an open system, i.e., there was direct contact between the soil and air. To increase the solubility of phenanthrene, thereby enhancing its transport through the soil, an aqueous solution of the anionic surfactant dodecyl sulfate was used as a flushing fluid. The results show that at the pilot scale considered, gravity and evaporation fluxes are more relevant than electrokinetic fluxes. Contrary to observations at the laboratory scale, desorption of PHE promoted by electric heating appears to be a significant removal mechanism at the pilot scale. In addition, PHE is dragged by the electroosmotic flow in the cathodic wells and by electrophoresis after interaction of the surfactant with phenanthrene in the anodic wells. In spite of the long treatment time (corresponding to an energy consumption over 500kWhm(-3)), the average removal attained was only 25%.
Related Concept Videos
Bioremediation
Microbial Bioremediation of Pesticides
Microbial Bioremediation of Hydrocarbons
Microbial Bioremediation of Uranium
Microbial Leaching

