Blood mononuclear cell proteome suggests integrin and Ras signaling as critical pathways for antidepressant treatment

Daniel Martins-de-Souza1, Giuseppina Maccarrone2, Marcus Ising2

  • 1Max Planck Institute of Psychiatry, Munich, Germany; Department of Psychiatry and Psychotherapy, Ludwig-Maximilians-University Munich, Munich, Germany; Laboratory of Neuroproteomics, Department of Biochemistry, Institute of Biology, State University of Campinas (UNICAMP), Campinas, Sao Paulo, Brazil.

Biological Psychiatry
|March 11, 2014
PubMed
Abstract

No abstract available in PubMed .

Related Concept Videos

Intracellular Signaling Affects Focal Adhesions01:17

Intracellular Signaling Affects Focal Adhesions

Integrins act both as extracellular input receivers and as intracellular processing activators. As their name suggests, integrins are entirely integrated into the membrane structure. Their hydrophobic membrane-spanning regions interact with the phospholipid bilayer's hydrophobic region. These membrane receptors provide extracellular attachment sites for effectors like hormones and growth factors. They activate intracellular response cascades when their effectors are bound and active.
Some...
2.8K
G-protein Coupled Receptors01:21

G-protein Coupled Receptors

G-protein coupled receptors are ligand binding receptors that indirectly affect changes in the cell. The actual receptor is a single polypeptide that transverses the cell membrane seven times creating intracellular and extracellular loops. The extracellular loops create a ligand specific pocket which binds to neurotransmitters or hormones. The intracellular loops holds onto the G-protein.
91.4K
Interactions Between Signaling Pathways01:19

Interactions Between Signaling Pathways

Signaling cascades usually lack linearity. Multiple pathways interact and regulate one another, allowing cells to integrate and respond to diverse environmental stimuli.
Convergence and divergence, and cross-talk between signaling pathways
Two distinct signaling pathways can converge on a single functional unit, which may either be a single protein or a complex of proteins. The response is either functionally distinct or synergistic between the two pathways but different from the response...
4.7K
Antidepressant Drugs: MAOIs and Other Agents01:23

Antidepressant Drugs: MAOIs and Other Agents

Atypical antidepressants, including bupropion (Wellbutrin), mirtazapine (Remeron), nefazodone (Serzone), trazodone (Desyrel), and vilazodone (Viibryd), offer unique mechanisms of action. Bupropion weakly inhibits dopamine and norepinephrine reuptake, aiding depression treatment and smoking cessation, with a low risk of sexual dysfunction. Mirtazapine enhances serotonin and norepinephrine neurotransmission, leading to sedation, increased appetite, and weight gain. As a result, it helps treat...
1.3K
Antidepressant Drugs: Overview01:25

Antidepressant Drugs: Overview

Antidepressant drugs are a class of medications primarily used for treating various mood disorders, including major depression, anxiety disorders, and other related conditions. These medicines work by modulating the neurotransmitter balance within the brain, alleviating depressive symptoms. Antidepressants can be broadly categorized into several groups according to their mechanism of action and chemical structure: Selective Serotonin Reuptake Inhibitors (SSRIs), Serotonin-Norepinephrine...
2.1K