Related Experiment Video
Updated: May 2, 2026

Implementation of a Hyperbolic Vortex Plasma Reactor for the Removal of Micropollutants in Water
Published on: July 25, 2025
Optimization of a full-scale Unitank wastewater treatment plant for biological phosphorus removal
Abstract:
The Unitank process combines the advantages of traditional continuous-flow activated sludge processes and sequencing batch reactors, and has been extensively employed in many wastewater treatment plants (WWTPs) in China. Biological phosphorus removal (BPR) of a full-scale Unitank WWTP was optimized by increasing anaerobic time from 80 to 120 min in an operation cycle of 360 min and reducing solid retention time (SRT) from 21.3 to 13.1 d. The BPR efficiency of the full-scale Unitank system increased from 63.8% (SRT of 21.3 d) to 83.2% for a SRT of 13.1 d. When the anaerobic time increased from 80 to 120 min, the net anaerobic phosphorus release amount increased from 0.25 to 1.06 mg L(-1), and sludge phosphorus content rose from 13.8 to 15.0 mgP x (gSS)(-1). During half an operation cycle, the average specific phosphorus release rate increased from 0.097mgP x (gVSS x h)(-1) in 0-40 min to 0.825 mgP x (gVSS x h)(-1) in 40-60 min. Reducing SRT and increasing anaerobic time account for 84.6% and 15.4% in the total increment of phosphorus removal of 1.15 mgL(-1).
More Related Videos
05:40Comparison of Scale in a Photosynthetic Reactor System for Algal Remediation of Wastewater
Published on: March 6, 2017
08:21Optimized Procedure for Determining the Adsorption of Phosphonates onto Granular Ferric Hydroxide using a Miniaturized Phosphorus Determination Method
Published on: May 18, 2018
Related Concept Videos
Upstream Processing
Bioreactor Design and Operational System
Methods of Medium Optimization
Microbial Bioremediation of Uranium
Factors Affecting Solubility
Environmental Applications of Microorganisms