Using project performance to measure effectiveness of quality management system maintenance and practices in

Tiong Kung Leong1, Norhayati Zakuan1, Muhamad Zameri Mat Saman2

  • 1Faculty of Management, Universiti Teknologi Malaysia, 81310 Skudai, Johor, Malaysia.

Related Concept Videos

Quality Control01:05

Quality Control

Quality control is one of the three cyclical quality assurance activities that help keep a system under statistical control. Typical quality control activities include creating quality control charts, conducting proficiency testing, and documenting and archiving results.
Quality control helps track data, visualize trends, and identify variations, making it easier to detect deviations that may affect the accuracy of an analysis. One way to do this is by generating a quality control chart, which...
4.2K
Introduction to Statistical Process Control01:15

Introduction to Statistical Process Control

Statistical Process Control (SPC) is a method used to monitor and control quality within processes, particularly in manufacturing and service delivery, by employing statistical methods. SPC aims to distinguish between natural (common cause) variation and variation due to specific changes or events (special cause), allowing for timely improvements and sustained quality. The control chart, a pivotal tool in SPC, visually displays data over time alongside a central line of upper and lower control...
831
Quality Assurance01:19

Quality Assurance

Quality assurance is the overarching term used to describe the activities employed to ensure the proper performance of a system. These activities can be classified into three categories: quality control, quality assessment, and internal corrective measures. Typically, these activities work cyclically: quality control is performed before and during the analysis, while quality assessment occurs during and after the investigation. Internal corrective measures are implemented based on the findings...
4.0K
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
410
Testing Water Quality01:14

Testing Water Quality

When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...
634
Self-Evaluation Maintenance Model01:29

Self-Evaluation Maintenance Model

The Self-Evaluation Maintenance (SEM) model offers a psychological framework to understand how individuals’ self-esteem is influenced by the achievements of others, particularly those with whom they share close personal bonds. The SEM model operates when personal rather than social identity guides individuals. Central to this model is the notion that individuals have an inherent desire to preserve a favorable self-image, which is continuously shaped by interpersonal comparisons and...
423