Related Experiment Video
Updated: Apr 27, 2026

Biosensor-based High Throughput Biopanning and Bioinformatics Analysis Strategy for the Global Validation of Drug-protein Interactions
Published on: December 1, 2020
An integrated bioinformatics infrastructure essential for advancing pharmacogenomics and personalized medicine in the
Weida Tong1, Stephen C Harris1, Hong Fang2
1Center for Toxicoinformatics, National Center for Toxicological Research, FDA, Jefferson, AR, USA.
Abstract:
Pharmacogenomics (PGx) is identified in the FDA Critical Path document as a major opportunity for advancing medical product development and personalized medicine. An integrated bioinformatics infrastructure for use in FDA data review is crucial to realize the benefits of PGx for public health. We have developed an integrated bioinformatics tool, called ArrayTrack, for managing, analyzing and interpreting genomic and other biomarker data (e.g. proteomic and metabolomic data). ArrayTrack is a highly flexible and robust software platform, which allows evolving with technological advances and changing user needs. ArrayTrack is used in the routine review of genomic data submitted to the FDA; here, three hypothetical examples of its use in the Voluntary eXploratory Data Submission (VXDS) program are illustrated.:
Related Concept Videos
Pharmacogenomics: Identification of New Drug Targets
Pharmacogenetic Phenotypes: Alterations in Pharmacokinetics, Drug Targets and Biologic Milieu
Pharmacogenetics and Pharmacogenomics: Overview
Drug Products: Biologics, Biosimilars and Interchangeables
Pharmacogenetics of Phase I Enzymes: Cytochrome P450 Isozymes
Pharmacogenetics of Drug Metabolism: Overview

