Delay analysis of networked control systems based on 100 M switched Ethernet

Ming Li1

  • 1College of Mathematics & Computer Science, Wuhan Textile University, Wuhan 430200, China.

Summary

Networked control systems using 100 M switched Ethernet offer improved performance. Proper configuration of multi-level switched Ethernet meets diverse control system timing needs, enhancing overall system feasibility.

Related Concept Videos

Multimachine Stability01:25

Multimachine Stability

Multimachine stability analysis is crucial for understanding the dynamics and stability of power systems with multiple synchronous machines. The objective is to solve the swing equations for a network of M machines connected to an N-bus power system.
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
677
Pilot and Numeric Relaying01:21

Pilot and Numeric Relaying

Pilot relaying is a type of differential protection used in power systems. It compares electrical quantities at the terminals of equipment via a communication channel instead of direct relay interconnection. This method is essential for transmission lines where the terminals are far apart, typically up to 80 km for lines with 69 to 115 kV ratings. Four types of communication channels are used for pilot relaying:
582
Network Function of a Circuit01:25

Network Function of a Circuit

Frequency response analysis in electrical circuits provides vital insights into a circuit's behavior as the frequency of the input signal changes. The transfer function, a mathematical tool, is instrumental in understanding this behavior. It defines the relationship between phasor output and input and comes in four types: voltage gain, current gain, transfer impedance, and transfer admittance. The critical components of the transfer function are the poles and zeros.
1.1K
Distribution Reliability and Automation01:25

Distribution Reliability and Automation

Distribution reliability in electrical power systems is critical for ensuring an uninterrupted power supply to consumers at minimal cost. According to IEEE Standard Terms, reliability is the probability that a device will function without failure over a specified time period or amount of usage. For electric power distribution, this translates to maintaining continuous power supply and addressing customer concerns over power outages. Several indices, as defined by IEEE Standard 1366-2012, are...
678
Control Systems: Applications01:25

Control Systems: Applications

Electrical engineering plays a pivotal role in our daily lives, with control systems at the heart of many applications, from home appliances to sophisticated space shuttles. Control systems manage and regulate the behavior of devices and processes, ensuring they function safely, correctly, and efficiently.
In modern vehicles, control systems manage various functions to enhance performance and safety. The steering wheel and accelerator are primary inputs in a car's control system. The...
1.2K
Transfer Function in Control Systems01:21

Transfer Function in Control Systems

The transfer function is a fundamental concept in the analysis and design of linear time-invariant (LTI) systems. It offers a concise way to understand how a system responds to different inputs in the frequency domain. It serves as a bridge between the time-domain differential equations that describe system dynamics and the frequency-domain representation that facilitates easier manipulation and analysis.
To derive the transfer function, consider a general nth-order linear time-invariant...
2.0K