Structural monitoring of metro infrastructure during shield tunneling construction

L Ran1, X W Ye2, G Ming1

  • 1Hangzhou Metro Group Co., Ltd., Hangzhou 310020, China.

Related Concept Videos

Non-destructive Tests for Concrete Strength01:12

Non-destructive Tests for Concrete Strength

The rebound hammer test, also known as the Schmidt hammer test, is a non-destructive technique for evaluating the hardness of concrete and, indirectly, the strength of concrete. It operates on the principle that the rebound of a spring-driven mass from a concrete surface correlates to the surface's hardness. The device comprises a mass within a tubular housing, a spring mechanism, and a plunger that strikes the concrete. Upon release, the energy imparted to the mass by the spring causes it...
1.0K
Reinforced Brick Masonry01:15

Reinforced Brick Masonry

Reinforced brick masonry is an advanced construction technique that enhances the structural integrity of brick walls by incorporating steel reinforcements. These reinforcements are either placed within the hollow cores of bricks or sandwiched between two layers of masonry, known as wythes, and are then secured in place with grout. Grout is a fluid mixture composed of Portland cement, aggregate, and water, providing the necessary bonding agent for the steel and brick.
To fortify brick walls...
2.4K
Posttensioned Masonry Walls01:15

Posttensioned Masonry Walls


Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...
652
Taping Over Different Ground Profiles01:12

Taping Over Different Ground Profiles

Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
496
Profile Leveling and Cross Sections01:26

Profile Leveling and Cross Sections

Profile leveling and cross-sections are surveying methods used to determine and document terrain elevations for infrastructure projects such as highways, railroads, canals, and pipelines. These methods provide data for earthwork planning and alignment of proposed routes.  Profile leveling involves measuring elevations along a fixed line to create a vertical terrain profile. A surveyor sets up a leveling instrument at the benchmark (BM) and records a backsight (BS) to determine the...
2.2K
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
546