Related Experiment Video
Updated: Apr 26, 2026

Mesocosm-Scale Constructed Wetland Design for Wastewater Treatment
Published on: May 2, 2025
Nitrogen mass balance in a constructed wetland treating piggery wastewater effluent
Soyoung Lee1, Marla C Maniquiz-Redillas2, Jiyeon Choi2
1Water Environment Research Dept., National Institute of Environmental Research, Hwangyeong-ro 42, Seo-gu, Incheon, 404-708, Korea.
Abstract:
The nitrogen changes and the nitrogen mass balance in a free water surface flow constructed wetland (CW) using the four-year monitoring data from 2008 to 2012 were estimated. The CW was composed of six cells in series that include the first settling basin (Cell 1), aeration pond (Cell 2), deep marsh (Cell 3), shallow marsh (Cell 4), deep marsh (Cell 5) and final settling basin (Cell 6). Analysis revealed that the NH(+)4-N concentration decreased because of ammonification which was then followed by nitrification. The NO(-)2-N and NO(-)2-N were also further reduced by means of microbial activities and plant uptake during photosynthesis. The average nitrogen concentration at the influent was 37,819 kg/year and approximately 45% of that amount exited the CW in the effluent. The denitrification amounted to 34% of the net nitrogen input, whereas the accretion of sediment was only 7%. The biomass uptake of plants was able to retain only 1% of total nitrogen load. In order to improve the nutrient removal by plant uptake, plant coverage in four cells (i.e., Cells 1, 3, 4 and 5) could be increased.
Related Concept Videos
Overview of Nitrogen Metabolism
The largest pool of nitrogen available in the terrestrial ecosystem is gaseous nitrogen (N2) from the air, but this...
The Nitrogen Cycle
Comparative Excretory Systems
Environmental Applications of Microorganisms

