Use of electronic apex locators may improve determination of working length

Isabel Mello1

  • 1Department of Dental Clinical Sciences, Faculty of Dentistry, Dalhousie University, Halifax, Canada.

Evidence-Based Dentistry
|December 20, 2014
PubMed
Abstract

Related Concept Videos

Electronic Distance Measuring Instruments01:30

Electronic Distance Measuring Instruments

Electronic Distance Measuring Instruments (EDMs) are essential tools in modern surveying, offering precise distance measurements by emitting electromagnetic signals and calculating the time required for these signals to travel to a target and return. Two primary types of signals are used in EDMs — light waves and microwaves — each suited to specific environmental and distance requirements. Light-wave-based EDMs utilize either infrared or laser light, providing high accuracy over...
724
Design Example: Measuring Distance Between Two Points with Obstructions01:10

Design Example: Measuring Distance Between Two Points with Obstructions

When measuring distances in areas with physical obstructions, such as a lake in a field, surveyors must employ techniques to calculate accurate lengths without direct line measurements. One effective method is the offset technique, which allows for precise distance estimation over inaccessible stretches.In this scenario, a surveyor must measure a side of an area that crosses a lake. Since the measuring tape cannot span the lake, the surveyor begins by establishing a baseline that aligns with...
548
Design Example: Marking Boundaries of a Site Using a Compass01:12

Design Example: Marking Boundaries of a Site Using a Compass

Marking site boundaries using a compass is a precise surveying technique that ensures the accuracy of boundary delineation. The process begins by using provided site details, including the bearings and lengths of each boundary line. The initial step involves calculating latitudes and departures for all sides of the site. This computation verifies that the traverse is free of errors, ensuring a closed and accurate boundary.The process starts at a known point, such as Point A, which is often...
363
Design Example: Identifying the Locations of Monuments in the Field Using Global Positioning System Device01:30

Design Example: Identifying the Locations of Monuments in the Field Using Global Positioning System Device

Surveyors use Global Positioning System (GPS) technology to measure the precise location and elevation of points on Earth. In a recent survey, GPS receivers were used to determine the coordinates and elevations of two park monuments. The process involved careful mission planning, data collection, and correction to ensure accuracy. The survey began with mission planning to identify optimal satellite visibility and minimize Position Dilution of Precision (PDOP). A geodetic control point...
495
Adjusting a Traverse01:12

Adjusting a Traverse

In the site survey of a four-sided traverse, internal angles are essential to ensure geometric accuracy. The survey revealed that the sum of the measured internal angles was 359 degrees and 48 minutes, which is 12 minutes less than the expected 360 degrees. This discrepancy signals an error likely arising from measurement inaccuracies during the fieldwork.To rectify this error, the adjustment process involved distributing the 12-minute shortfall equally across the four internal angles. By...
452
Common Leveling Mistakes and Errors01:17

Common Leveling Mistakes and Errors

A survey team is tasked with determining the elevation difference between points Point A and Point B, separated by uneven terrain. They use a leveling instrument and a leveling rod.Common MistakesMisreading the Rod: During a backsight reading at Point A, the instrumentman observes the rod partially obscured by tall grass. Instead of reading 1.135 m, they mistakenly record 1.735 m due to the misalignment of the crosshair with the wrong graduation. This error adds 0.600 m to all subsequent...
629