Related Experiment Video
Updated: Feb 19, 2026

Scalable Step-by-Step Approach of Sustainable Bioplastic Production from Food Waste
Published on: July 18, 2025
Simultaneous removal of nutrients from milking parlor wastewater using an AO2 sequencing batch reactor (SBR) system
1a Southern Research and Outreach Center , University of Minnesota , Waseca , Minnesota , USA.
Abstract:
The feasibility of using a lab-scale, anaerobic-aerobic-anoxic-aerobic sequencing batch reactor ((AO)2 SBR) to simultaneously remove biological organics, nitrogen and phosphorus from dairy milking parlor wastewater was investigated in this study. Three hydraulic retention times (HRT = 2.1, 2.7, and 3.5 days) and three mixing-to-process time ratios (TM/TP = 0.43, 0.57, and 0.68) were evaluated as two controlling factors using a 3 × 3 experimental design to determine the optimal combination. Results showed that the HRT of 2.7 days with TM/TP = 0.57 was the best to achieve simultaneous nutrients removal for the influent with initial soluble chemical oxygen demand (SCOD) of about 2000 mg L(-1) (only 0.55 mg L(-1) NH4-N, < 0.1 mg L(-1) nitrate, and 0.14 mg L(-1) soluble phosphorus in the effluent). Good correlations between pH and ORP, and ORP and DO, were also obtained with correlation coefficients all higher than or equal to 0.975. These relationships could be used to develop real-time control strategies to optimize the duration of each operating phase in the (AO)2 SBR system to save energy and enhance treatment efficiency.

