Using a quantitative risk register to promote learning from a patient safety reporting system

James G Mansfield1, Robert A Caplan, John S Campos

  • 1Virginia Mason, Seattle, USA.

Abstract

Related Concept Videos

Types of Reports II: Incident or Occurrence Report01:21

Types of Reports II: Incident or Occurrence Report

An Incident or Occurrence Report in a healthcare setting is a crucial document used to record any unexpected occurrence that may or may not have affected a patient, employee, or visitor. Such reports are critical to improving patient safety and include all details leading up to and including the event.
Purposes:
In the healthcare industry, reports play a crucial role in documenting incidents within an agency. The primary objective of these reports is to ensure patient safety, uphold the...
1.4K
Data Reporting and Recording01:24

Data Reporting and Recording

Reporting and recording are crucial in data documentation. The timely, thorough, and accurate documentation of facts is essential when recording patient data. Failure to record findings during an assessment or interpretation of a problem will result in loss of information and make the patient document unreliable. The reader is left with general impressions if the information is not specific. A recording is documenting data of the individual's health information in a traceable, secure, and...
5.7K
Types of Reports III: Telephone and Verbal Reports01:26

Types of Reports III: Telephone and Verbal Reports

Telephone and Verbal Reports in healthcare settings are two communication methods for conveying therapeutic instructions from healthcare providers to nurses or other healthcare staff.
Here's an overview of each type:
Telephone Orders
1.2K
Types of Biopharmaceutical Studies: Controlled and Non-Controlled Approaches01:23

Types of Biopharmaceutical Studies: Controlled and Non-Controlled Approaches

Biopharmaceutical studies constitute a vital field aiming to enhance drug delivery methods and refine therapeutic approaches, drawing upon diverse interdisciplinary knowledge. In research methodologies, the choice between controlled and non-controlled studies significantly influences the study's reliability and accuracy.
Non-controlled studies, commonly employed for initial exploration, lack a control group, rendering them susceptible to biases and external influences. In contrast,...
565
Pharmacovigilance01:19

Pharmacovigilance

Post-marketing surveillance is a critical component of pharmaceutical regulation, often uncovering unanticipated adverse drug reactions (ADRs) once a drug is widely used over an extended period.
This process, termed pharmacovigilance, aims to detect, evaluate, and minimize harmful effects related to medication use. The data collection for pharmacovigilance depends on spontaneous reporting systems, where healthcare professionals or patients voluntarily report suspected ADRs.
In some cases, there...
2.0K
Introduction to Documentation and Reporting01:20

Introduction to Documentation and Reporting

Documentation is the systematic process of formally recording, maintaining, and communicating information.
Nursing documentation records essential information and details regarding a patient's care and treatment in written or electronic form. It is a critical aspect of nursing practice that involves documenting assessments, interventions, outcomes, and other relevant details about a patient's health status.
Documentation maps the patient's health journey by creating a comprehensive...
3.9K