A systematic approach to standardize artificial aging of resin composite cements

Lukas Blumer1, Fredy Schmidli1, Roland Weiger2

  • 1Department of Dental Materials and Engineering, University Hospital of Dental Medicine, University of Basel, Basel, Switzerland.

Abstract

Related Concept Videos

Accelerated Curing of Concrete01:25

Accelerated Curing of Concrete

Accelerating concrete curing is achieved by applying heat and additional moisture. This process accelerates the hydration of the cement, resulting in an earlier strength gain in the concrete. Steam curing is a method wherein the concrete products are either transported through a chamber on a conveyor belt or encased in plastic, allowing steam at atmospheric pressure to circulate freely around them. This process begins with a phase of moist curing that typically lasts between 3 to 5 hours, after...
611
Retarders01:19

Retarders

Retarders are chemical admixtures designed to extend the setting time, which is especially useful when there is a delay in sequential concrete pours to prevent cold joints and to achieve a cohesive structure. Retarders, when used in appropriate amounts, can also enhance the architectural appearance of exposed aggregate finishes.
The function of retarders is to delay the setting of concrete, and this effect can be measured using a penetration test. The retardation process involves adding...
323
Testing Water Quality01:14

Testing Water Quality

When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...
580
Curing of Concrete01:20

Curing of Concrete

The hydration of cement takes place within the water-filled capillary pores. However, environmental elements can disrupt this process by evaporating water from the concrete surfaces. Sealed concrete with a water-cement ratio below 0.5 experiences self-desiccation, leading to water loss. The water loss in concrete is mitigated by curing. This technique involves keeping the concrete saturated to maintain the necessary temperature and moisture conditions, to optimally fill the spaces in the cement...
1.3K
Setting Time of Cement01:12

Setting Time of Cement

The setting time of cement refers to the process of cement paste transitioning from a plastic state to a solid state. This process is crucial in construction as it dictates the timeframe for concrete placement, compaction, and finishing. The onset of this solidification is termed the initial set, indicating when the paste becomes unworkable. The final set is when the paste has solidified completely, and further handling or manipulation can no longer affect its shape. The cement strength is...
1.0K
Strength of Cement01:20

Strength of Cement

Strength tests for cement are not performed directly on neat cement paste due to difficulty in obtaining consistent, reliable specimens. Instead, cement is typically tested in the form of cement-sand mortar.
For compressive strength tests, ASTM C 109-05 standards prescribe a cement-sand mix ratio of 1:2.75 and a water/cement ratio of 0.485 for making 2-inch cubes. These cubes are mixed, cast, and cured in saturated lime water at 23°C until testing. Flexural strength testing, outlined in...
793