Related Concept Videos

Cells Coordinate Growth and Proliferation02:36

Cells Coordinate Growth and Proliferation

Cell size is a significant factor impacting cellular design, function, and fitness. There exists some internal coordination by which cells double their masses before division, thus, achieving homeostasis. Coordination between cell growth and proliferation depends on the checkpoints in between cell cycle phases. Loss of coordination or failure in the checkpoint mechanism can drive the cell to uncontrolled growth and loss of cellular function. Like dividing cells that coordinate cellular growth,...
5.3K
Cells Coordinate Growth and Proliferation02:36

Cells Coordinate Growth and Proliferation

3.3K
Meristems and Plant Growth02:36

Meristems and Plant Growth

Plants grow throughout their lives; this is called indeterminate growth, and it distinguishes plants from most animals. Although certain parts of plants stop growing (e.g., leaves and flowers), others grow continuously—like roots and stems.
51.4K
Whole Body Regeneration01:33

Whole Body Regeneration

Regeneration is the process of restoring injured or lost tissues, organs, or body parts. While simpler organisms generally show greater ability to regenerate their whole body, few complex animals show similarly exceptional regeneration. For example, planarian flatworms have a unique regenerative potential making them a popular study organism among biologists to understand the mechanisms of whole body regeneration. Other organisms, such as hydra, also show extreme regeneration potential;...
4.7K
Diversity in Cell Signaling Responses01:22

Diversity in Cell Signaling Responses

The physiological function of a cell and cellular communication are outcomes of a range of extrinsic signals, intracellular signaling pathways, and cellular responses. No two cell types express the same repertoire of signaling components. Receptors are highly selective for their cognate ligands, but once activated, they can alter multiple cellular processes such as DNA transcription, protein synthesis, and metabolic activity. 
Graded and Abrupt Responses
Some signaling systems generate...
8.8K
mTOR Signaling and Cancer Progression03:03

mTOR Signaling and Cancer Progression

The mammalian target of rapamycin or mTOR protein was discovered in 1994 due to its direct interaction with rapamycin. The protein gets its name from a yeast homolog called TOR. The mTOR protein complex in mammalian cells plays a major role in balancing anabolic processes such as the synthesis of proteins, lipids, and nucleotides and catabolic processes, such as autophagy in response to environmental cues, such as availability of nutrients and growth factors.
The mTOR pathway or the...
5.1K