Related Experiment Video
Updated: Apr 9, 2026

A Novel Approach for the Administration of Medications and Fluids in Emergency Scenarios and Settings
Published on: November 9, 2016
Using lean principles to improve outpatient adult infusion clinic chemotherapy preparation turnaround times
Matthew H Lamm1, Stephen Eckel1, Rowell Daniels1
1Matthew H. Lamm, Pharm.D., M.S., BCPS, is Lead Pharmacist, Department of Pharmacy, University of North Carolina (UNC) Hospitals-Hillsborough Campus, Chapel Hill. Stephen Eckel, Pharm.D., M.H.A., BCPS, FAPhA, FASHP, is Associate Director of Pharmacy, UNC Hospitals, and Clinical Associate Professor, Eshelman School of Pharmacy, UNC, Chapel Hill. Rowell Daniels, Pharm.D., M.S., is Director of Pharmacy, UNC Hospitals, and Executive Associate Dean of Clinical Practice, Eshelman School of Pharmacy, UNC. Lindsey B. Amerine, Pharm.D., M.S., BCPS, is Assistant Director, Department of Pharmacy, UNC Hospitals, and Assistant Professor of Clinical Education, Eshelman School of Pharmacy, UNC.
Purpose:
The workflow and chemotherapy preparation turnaround times at an adult infusion clinic were evaluated to identify opportunities to optimize workflow and efficiency.
Methods:
A three-phase study using Lean Six Sigma methodology was conducted. In phase 1, chemotherapy turnaround times in the adult infusion clinic were examined one year after the interim goal of a 45-minute turnaround time was established. Phase 2 implemented various experiments including a five-day Kaizen event, using lean principles in an effort to decrease chemotherapy preparation turnaround times in a controlled setting. Phase 3 included the implementation of process-improvement strategies identified during the Kaizen event, coupled with a final refinement of operational processes.
Results:
In phase 1, the mean turnaround time for all chemotherapy preparations decreased from 60 to 44 minutes, and a mean of 52 orders for adult outpatient chemotherapy infusions was received each day. After installing new processes, the mean turnaround time had improved to 37 minutes for each chemotherapy preparation in phase 2. In phase 3, the mean turnaround time decreased from 37 to 26 minutes. The overall mean turnaround time was reduced by 26 minutes, representing a 57% decrease in turnaround times in 19 months through the elimination of waste and the implementation of lean principles. This reduction was accomplished through increased efficiencies in the workplace, with no addition of human resources.
Conclusion:
Implementation of Lean Six Sigma principles improved workflow and efficiency at an adult infusion clinic and reduced the overall chemotherapy turnaround times from 60 to 26 minutes.
Related Concept Videos
One-Compartment Model: IV Infusion
The one-compartment model for IV infusion uses mathematical equations to describe the rate of change in drug quantity in the body. At steady-state or infusion equilibrium, the drug input...
IV Infusion to Oral Dosing: Conversion Methods
Nursing Ethical Principles II
Consider the following scenario, which illustrates how these principles are applied in the care of Mr. John, a fifty-year-old teacher diagnosed with metastatic liver cancer.
Initially, Mr. John's...
Determination of Multiple Dosing Parameters: Steady-State, Minimum and Maximum Concentrations
One-Compartment Open Model for IV Bolus Administration: Estimation of Clearance
In the one-compartment open model for intravenous (IV) bolus administration, clearance is estimated by dividing the elimination rate by the plasma drug concentration. This equation leverages the elimination rate constant and the apparent...
Drug Accumulation During Multiple Dosing: Intermittent IV Infusions

