"Right place at the right time" impacts outcomes for acute intestinal obstruction

Anai N Kothari1, Jordan L Liles2, Casey J Holmes3

  • 1Department of Surgery, Loyola University Medical Center, Maywood, IL; One:MAP Surgical Analytics Group at LUMC Surgery, Loyola University Medical Center, Maywood, IL.

Surgery
|August 6, 2015
PubMed
Abstract

Related Concept Videos

Reason and Intuition01:37

Reason and Intuition

The human brain processes information for decision-making using one of two routes: an intuitive system and a rational system (Epstein, 1994; popularized by Kahneman, 2011 as System 1 and System 2, respectively). The intuitive system is quick, impulsive, and operates with minimal effort, relying on emotions or habits to provide cues for what to do next, while the rational system is logical, analytical, deliberate, and methodical. Research in neuropsychology suggests that the...
7.7K
Social Traps01:41

Social Traps

Social traps are negative situations where people get caught in a direction or relationship that later proves to be unpleasant, with no easy way to back out of or avoid. The concept was orignally introduced by John Platt who applied psychology to Garrett Hardin's "Tragedy of the Commons", where in New England herd owners could let their cattle graze in the common ground. This situation seems like a good idea, but an individual could have an advantage. If they owned...
27.1K
The Availability Heuristic01:08

The Availability Heuristic

A heuristic is a general problem-solving framework (Tversky & Kahneman, 1974). You can think of these as mental shortcuts that are used to solve problems. Different types of heuristics are used in different types of situations, and the impulse to use a heuristic occurs when one of five conditions is met (Pratkanis, 1989):
7.3K
Accuracy and Precision01:52

Accuracy and Precision

3.1K
Timing and Consequences on Behavior01:08

Timing and Consequences on Behavior

In operant conditioning, the timing of reinforcement is crucial. For animals like rats and cats, immediate reinforcement (within a few seconds) is much more effective than delayed reinforcement. For example, a food reward for a rat needs to follow within 30 seconds of pressing a bar to be effective. 
Humans, however, can respond to delayed reinforcers. We often make decisions between immediate small rewards and delayed larger rewards. This ability to delay gratification is a significant...
701
Hindsight Biases01:12

Hindsight Biases

Hindsight bias leads you to believe that the event you just experienced was predictable, even though it really wasn’t. In other words, you knew all along that things would turn out the way they did. Can you relate this to the phrase "Hindsight is 20/20" now? 
4.5K