Weir
Quality of Water
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Water Cement Ratio
Underflow Gates
Weir: Problem Solving
You might also read
Articles linked to this work by shared authors, journal, and citation graph.
Updated: Apr 5, 2026

Parameterizing V-notch Weir Equations for Flow Monitoring in a Drainage Control Structure
Published on: April 25, 2025
Mike Muller1, Asit Biswas2, Roberto Martin-Hurtado3
1School of Governance, University of the Witwatersrand, Johannesburg, South Africa. mike.muller@wits.ac.za.
No abstract available in PubMed .