Related Experiment Video
Updated: Apr 4, 2026

Operant Protocols for Assessing the Cost-benefit Analysis During Reinforced Decision Making by Rodents
Published on: September 10, 2018
Environmental cost of using poor decision metrics to prioritize environmental projects
David J Pannell1, Fiona L Gibson1
1Centre for Environmental Economics and Policy, School of Agricultural and Resource Economics, University of Western Australia, 35 Stirling Highway, Crawley, WA, 6009, Australia.
Abstract:
Conservation decision makers commonly use project-scoring metrics that are inconsistent with theory on optimal ranking of projects. As a result, there may often be a loss of environmental benefits. We estimated the magnitudes of these losses for various metrics that deviate from theory in ways that are common in practice. These metrics included cases where relevant variables were omitted from the benefits metric, project costs were omitted, and benefits were calculated using a faulty functional form. We estimated distributions of parameters from 129 environmental projects from Australia, New Zealand, and Italy for which detailed analyses had been completed previously. The cost of using poor prioritization metrics (in terms of lost environmental values) was often high--up to 80% in the scenarios we examined. The cost in percentage terms was greater when the budget was smaller. The most costly errors were omitting information about environmental values (up to 31% loss of environmental values), omitting project costs (up to 35% loss), omitting the effectiveness of management actions (up to 9% loss), and using a weighted-additive decision metric for variables that should be multiplied (up to 23% loss). The latter 3 are errors that occur commonly in real-world decision metrics, in combination often reducing potential benefits from conservation investments by 30-50%. Uncertainty about parameter values also reduced the benefits from investments in conservation projects but often not by as much as faulty prioritization metrics.
Related Concept Videos
Decision Making: P-value Method
First, a specific claim about the population parameter is proposed. The claim is based on the research question and is stated in a simple form. Further, an opposing statement to the claim is also stated. These statements can act as null and alternative hypotheses: a null hypothesis would be a neutral statement while the alternative hypothesis can...
The Availability Heuristic
The Anchoring-and-Adjustment Heuristic
Design Example: Alignment of a Road Line Using GIS
Decision Making: Traditional Method
First, a specific claim about the population parameter is decided based on the research question and is stated in a simple form. Further, an opposing statement to this claim is also stated. These statements can act as null and alternative hypotheses, out of which a null hypothesis would be a...
Decision Making
Automatic decision-making is fast, intuitive, and relies on gut feelings...

