Related Experiment Video
Updated: Mar 29, 2026

10:09
Operation of the Collaborative Composite Manufacturing CCM System
Published on: October 1, 2019
7.2K
Flexible facility design, management approach critical in era of unprecedented industry change
Abstract
No abstract available in PubMed .
Related Concept Videos
Design Example: Sustainability in Concrete Building
467
As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
467
Design of Prismatic Beams for Bending
673
The design of prismatic beams, structural elements with a uniform cross-section, focuses on ensuring safety and structural integrity under load. The design process begins by determining the allowable stress, either from material properties tables, or by dividing the material's ultimate strength by a safety factor. This safety factor is essential for accommodating uncertainties, and varies depending on the material—timber, steel, or concrete—with each having unique strength and...
673
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
379
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
379
Design Example: Managing Concrete Workability
331
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
331
Design Consideration
634
Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
The factor of safety is another key...
634
Types of Building Separation Joints
706
Building separation joints divide large or complex building structures into smaller, discrete units that can move independently. These joints are categorized into three types: volume-change joints, settlement joints, and seismic separation joints.
Volume-change joints address the effects of expansion and contraction due to temperature and moisture variations. They are strategically placed at discontinuities in a building's mass where cracking is most likely and are spaced about 150 to 200...
Volume-change joints address the effects of expansion and contraction due to temperature and moisture variations. They are strategically placed at discontinuities in a building's mass where cracking is most likely and are spaced about 150 to 200...
706

