[Scale effect of Li-Xiang Railway construction impact on landscape pattern and its ecological risk]

Related Concept Videos

Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
379
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
409
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
517
Common Leveling Mistakes and Errors01:17

Common Leveling Mistakes and Errors

A survey team is tasked with determining the elevation difference between points Point A and Point B, separated by uneven terrain. They use a leveling instrument and a leveling rod.Common MistakesMisreading the Rod: During a backsight reading at Point A, the instrumentman observes the rod partially obscured by tall grass. Instead of reading 1.135 m, they mistakenly record 1.735 m due to the misalignment of the crosshair with the wrong graduation. This error adds 0.600 m to all subsequent...
590
Ecological Disturbance02:26

Ecological Disturbance

An ecological disturbance is a temporary disruption in the environment resulting from abiotic, biotic, or anthropogenic factors, causing a pronounced change in an ecosystem. The impact of an ecological disturbance, which can depend on its intensity, frequency, and spatial distribution, plays a significant role in shaping the species diversity within the ecosystem.
21.5K
Threats to Biodiversity01:50

Threats to Biodiversity

There have been five major extinction events throughout geological history, resulting in the elimination of biodiversity, followed by a rebound of species that adapted to the new conditions. In the current geological epoch, the Holocene, there is a sixth extinction event in progress. This mass extinction has been attributed to human activities and is thus provisionally called the Anthropocene. In 2019 the human population reached 7.7 billion people and is projected to comprise 10 billion by...
27.8K