Related Experiment Video
Updated: Mar 26, 2026

An Inverse Analysis Approach to the Characterization of Chemical Transport in Paints
Published on: August 29, 2014
Assessing uncertainty in pollutant build-up and wash-off processes
Buddhi Wijesiri1, Prasanna Egodawatta1, James McGree1
1Science and Engineering Faculty, Queensland University of Technology (QUT), GPO Box 2434, Brisbane, 4001, Queensland, Australia.
Understanding uncertainty in pollutant build-up and wash-off is crucial for effective stormwater pollution mitigation. Accounting for process variability in models improves accuracy without sacrificing performance, especially for fine particles.
Area of Science:
- Environmental Science
- Hydrology
- Water Quality Modeling
Background:
- Stormwater runoff from urban areas carries pollutants, impacting water quality.
- Accurate modeling of pollutant build-up and wash-off is essential for effective mitigation strategies.
- Current models often fail to capture the inherent variability of these processes, leading to inaccurate predictions.
Purpose of the Study:
- To assess the importance of uncertainty in build-up and wash-off processes for stormwater quality models.
- To investigate methods for incorporating process variability into mathematical models.
- To understand the propagation of uncertainty from build-up to wash-off.
Main Methods:
- Modifying the mathematical form of existing stormwater quality models to include process variability.
- Analyzing the impact of incorporating variability on model prediction performance.
- Investigating uncertainty propagation from the build-up to the wash-off phase.
Main Results:
- Incorporating process variability into model structures improves the representation of variations in pollutant loads.
- Changes to model mathematical forms can account for uncertainty without significantly degrading prediction performance.
- Uncertainty in the build-up process substantially influences uncertainty in the wash-off process.
Conclusions:
- Accurate assessment of build-up and wash-off uncertainty is vital for informed decision-making in stormwater management.
- Mathematical models can be adapted to better represent process variability, enhancing stormwater pollution assessment.
- The behavior of fine particles (<150 μm) during build-up is a key factor driving uncertainty propagation in wash-off events.
Related Concept Videos
Washing, Drying, and Ignition of Precipitates
Uncertainty: Overview
Strategies for Assessing and Addressing Confounding
Confounding can be addressed at both the design phase of a study and through analytical methods after data...

