Related Experiment Video
Updated: Mar 26, 2026

Watershed Planning within a Quantitative Scenario Analysis Framework
Published on: July 24, 2016
Information preferences for the evaluation of coastal development impacts on ecosystem services: A multi-criteria
Jean-Baptiste Marre1, Sean Pascoe2, Olivier Thébaud3
1Université de Bretagne Occidentale, UMR AMURE, Brest, France; CSIRO Wealth from Oceans Flagship, Marine and Atmospheric Research, Brisbane, Australia; School of Economics and Finance, Queensland University of Technology, Brisbane, Australia.
Abstract:
Ecosystem based management requires the integration of various types of assessment indicators. Understanding stakeholders' information preferences is important, in selecting those indicators that best support management and policy. Both the preferences of decision-makers and the general public may matter, in democratic participatory management institutions. This paper presents a multi-criteria analysis aimed at quantifying the relative importance to these groups of economic, ecological and socio-economic indicators usually considered when managing ecosystem services in a coastal development context. The Analytic Hierarchy Process (AHP) is applied within two nationwide surveys in Australia, and preferences of both the general public and decision-makers for these indicators are elicited and compared. Results show that, on average across both groups, the priority in assessing a generic coastal development project is for the ecological assessment of its impacts on marine biodiversity. Ecological assessment indicators are globally preferred to both economic and socio-economic indicators regardless of the nature of the impacts studied. These results are observed for a significantly larger proportion of decision-maker than general public respondents, questioning the extent to which the general public's preferences are well reflected in decision-making processes.
Related Concept Videos
Sustainable Development
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Keystone Species
Ecological Disturbance
Decision Making: P-value Method
First, a specific claim about the population parameter is proposed. The claim is based on the research question and is stated in a simple form. Further, an opposing statement to the claim is also stated. These statements can act as null and alternative hypotheses: a null hypothesis would be a neutral statement while the alternative hypothesis can...
Quality of Water

