Jove
Visualize
Contact Us
JoVE
x logofacebook logolinkedin logoyoutube logo
ABOUT JoVE
OverviewLeadershipBlogJoVE Help Center
AUTHORS
Publishing ProcessEditorial BoardScope & PoliciesPeer ReviewFAQSubmit
LIBRARIANS
TestimonialsSubscriptionsAccessResourcesLibrary Advisory BoardFAQ
RESEARCH
JoVE JournalMethods CollectionsJoVE Encyclopedia of ExperimentsArchive
EDUCATION
JoVE CoreJoVE BusinessJoVE Science EducationJoVE Lab ManualFaculty Resource CenterFaculty Site
Terms & Conditions of Use
Privacy Policy
Policies

Related Concept Videos

Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

512
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
512
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

358
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
358
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

329
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
329
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

406
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
406
Design Example: Designing a Residential Plumbing System01:25

Design Example: Designing a Residential Plumbing System

1.2K
The design of residential plumbing systems requires carefully evaluating water demand, flow rates, and pressure dynamics to ensure both efficiency and reliability. The nature of water flow within pipes is defined by its Reynolds number, which classifies flow as either laminar (smooth) or turbulent.
1.2K
Design Example: Dimensioning of Concrete Masonry Construction01:13

Design Example: Dimensioning of Concrete Masonry Construction

377
For the construction of a storeroom using concrete masonry units, it's essential to align the dimensions of the structure with the actual sizes of the blocks and the intended mortar joints. On the site in question, there's a stockpile of concrete masonry blocks with a nominal size of eight by eight by sixteen inches, which are to be used in the construction of the storeroom.
The site engineer has laid out a plan for the storeroom with external dimensions of twelve feet in length and...
377

You might also read

Related Articles

Articles linked to this work by shared authors, journal, and citation graph.

Sort by
Same author

Building a Biobank.

Biopreservation and biobanking·2016
Same author

Repository Planning, Design, and Engineering: Part I--Infrastructure.

Biopreservation and biobanking·2016
Same author

Quality management of biorepositories.

Biopreservation and biobanking·2015
Same author

Homocysteine and vitamin B(12) concentrations and mortality rates in type 2 diabetes.

Diabetes/metabolism research and reviews·2006
Same author

Biochemical indicators of B vitamin status in the US population after folic acid fortification: results from the National Health and Nutrition Examination Survey 1999-2000.

The American journal of clinical nutrition·2005
Same author

Hematological and iron-related analytes--reference data for persons aged 1 year and over: United States, 1988-94.

Vital and health statistics. Series 11, Data from the National Health Survey·2005

Related Experiment Video

Updated: Mar 25, 2026

Design and Construction of an Urban Runoff Research Facility
13:48

Design and Construction of an Urban Runoff Research Facility

Published on: August 8, 2014

13.7K

Repository Planning, Design, and Engineering: Part II-Equipment and Costing.

Phillip M Baird1, Elaine W Gunter2

  • 11 Daingerfield Consulting , Fairfax Station, Virginia.

Biopreservation and Biobanking
|February 18, 2016
PubMed
Summary

This guide details essential equipment and systems for operating repositories, including cost models for startup and large-scale facilities. It covers storage, monitoring, and support systems for successful repository development.

More Related Videos

Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System
08:25

Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System

Published on: April 11, 2018

16.1K
A Modeling and Simulation Method for Preliminary Design of an Electro-Variable Displacement Pump
09:04

A Modeling and Simulation Method for Preliminary Design of an Electro-Variable Displacement Pump

Published on: June 1, 2022

3.7K

Related Experiment Videos

Last Updated: Mar 25, 2026

Design and Construction of an Urban Runoff Research Facility
13:48

Design and Construction of an Urban Runoff Research Facility

Published on: August 8, 2014

13.7K
Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System
08:25

Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System

Published on: April 11, 2018

16.1K
A Modeling and Simulation Method for Preliminary Design of an Electro-Variable Displacement Pump
09:04

A Modeling and Simulation Method for Preliminary Design of an Electro-Variable Displacement Pump

Published on: June 1, 2022

3.7K

Area of Science:

  • Repository Science
  • Biorepository Management
  • Laboratory Infrastructure

Background:

  • Operationalizing a repository requires specific equipment and systems.
  • Both large-scale facilities and small-scale startups have distinct needs.
  • Understanding acquisition costs is crucial for repository development.

Purpose of the Study:

  • To provide guidance on necessary equipment and systems for repository operation.
  • To present detailed information on various storage, monitoring, and support systems.
  • To offer cost estimates and a cost model for establishing repositories.

Main Methods:

  • Detailed presentation of various storage equipment types.
  • Description of monitoring and support systems.
  • Development of a cost model for repository acquisition costs.

Main Results:

  • Guidance provided for both large repositories and small-scale startups.
  • Cost model includes expected acquisition costs for major capital items.
  • Assumed facility size of 5,000-7,000 sq ft with 50 frozen storage units.

Conclusions:

  • Essential operational components for repositories are identified.
  • Cost estimations provide a framework for capital investment planning.
  • The study supports the development of repositories with growth potential.