Related Experiment Video
Updated: Mar 24, 2026

Preparing an Isotopically Pure 229Th Ion Beam for Studies of 229mTh
Published on: May 3, 2019
Pre-conditioning procedure suitable for internal-RF-antenna of J-PARC RF-driven H⁻ ion source
Abstract:
The Japan Proton Accelerator Research Complex (J-PARC) cesiated RF-driven H(-) ion source has been successfully operated for about 1 yr. By the world brightest level beam, the J-PARC design beam power of 1 MW was successfully demonstrated. Although no internal-RF-antenna failure, except for the once caused by an excess cesium due to a misoperation, occurred in the operation, many antennas failed in pre-conditionings for the first hundred days. The antenna failure rate was drastically decreased by using an antenna with coating thicker than a standard value and the pre-conditioning procedure repeating 15 min 25 kW RF-power operation and impurity-gas evacuation a few times, before the full power (50 kW) operation.
More Related Videos
14:11Quantification of Hydrogen Concentrations in Surface and Interface Layers and Bulk Materials through Depth Profiling with Nuclear Reaction Analysis
Published on: March 29, 2016
06:20Irradiator Commissioning and Dosimetry for Assessment of LQ α and β Parameters, Radiation Dosing Schema, and in vivo Dose Deposition
Published on: March 11, 2021
Related Concept Videos
Inductively Coupled Plasma–Mass Spectrometry (ICP–MS): Overview
Inductively Coupled Plasma Atomic Emission Spectroscopy: Principle
The ions and electrons produced interact with the fluctuating magnetic field created by a water-cooled...
Double Resonance Techniques: Overview
Spin decoupling is usually achieved by...
NMR Spectrometers: Radiofrequency Pulses and Pulse Sequences